Laserfiche WebLink
I= M = M M m m m M M M = = M <br />Table 1. Result of Quarterly Monitoring, GCC Rio Grande, Inc., Pueblo Cement Plant. Sampling conducted October 20, 2009. - <br />Continued <br />Ana a Method Units MW-002 MW-003 MW-004 Du -01 EB-01 <br />GENERAL CHEMISTRY <br />Total Alkahni SM2320B m /L 450 390 506 434 <0.50 <br />Bicarbonate SM2320B tn/L 450 390 506 434 <0.50 <br />Carbonate SM2320B m /L <5.0 <5.0 <5.0 <5.0 <0.50 <br />Chloride E300.0 m /L 47.5 70.5 42.8 47.2 <0.50 <br />Fluoride SM450OF-C m /L 0.60 0.98 0.79 0.60 <0.20 <br />Sulfate E300.0 m /L 1,070 1,700 1,510 1,050 <0.50 <br /> <br />Ammonia as SM4500- <br />NH3 <br />Mg/L <br />0.42 <br />0.10 <br /><0.10 <br />0.34 <br />NA <br />Nitrite as E300.0 M /L <0.12 <0.12 <0.12 <0.12 <0.061 <br />Nitrate as E300.0 M /L <0.09 <0.09 4.33 <0.09 <0.45 <br /> <br />Total Cations Calculated Me /L 27.52 40.12 39.69 25.53 NA <br />Total Anions Calculated Me /L 32.61 45.18 43.07 31.87 NA <br />Cation-Anion Balance Calculated % Diff 8.46 5.94 4.08 11.03 NA <br /> NA <br />Total Hardness Calculated mg/L as .aC03 980 1,500 1,400 930 NA <br />Total dissolved solids SM 2540C M /L 1,880 2,980 2,800 1,920 NA <br />2 of 3