Laserfiche WebLink
?nnrr a+eWab=m <br />IluljlfWEmli?4eXW IJU <br />CLIENT: Cotter Corporation <br />Project: Schwartzwalder Water Monitoring Program Disc <br />Sample Delivery Group: C10110384 <br />.724711 e Billings, NT 808-7354419 <br />RAnid UY. SO 8IB-672-1225 • Cdlm <br />Report Date: 12/09/10 <br />CASE NARRATIVE <br />PREP COMMENTS <br />The prep hold time for the Filtration of metals was exceeded by up to 2.33 days. <br />Page 2 of 9