Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 0610612011 <br />User : RCO <br />CIRCES Cost Estimating Software <br />HYDRAULIC EXCAVATOR WORK <br />State : Colorado Permit/job # : P-2011-011 <br />County :Mineral Abbreviation :none <br />Site :East Upper Rat Creek Filename :P011-003 <br />Agency or organization name: DRMS <br />Permit or other job action : New NOI <br />Task description :Pull up material for recontouring pads (2) <br />HOURLY EQUIPMENT COST <br />Machine description : Cat 320C <br />Cost Breakdown : Utilization % <br />Ownership cost/hour : $26.97 NA <br />Operating cost/hour : $32.00 100 <br />Operator cost/hour : $38.72 NA <br />Total unit cost/hour : $97.69 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 807 BCY factor : 1.330 volume <br />Horsepower: 138 <br />Weight (MT) : 19.70 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Total fleet cost/hour : $97.69 <br /> <br />1,073 LCY <br />Source of estimated volume : NOI maps <br />Source of estimated swell factor :na <br />HOURLY PRODUCTION <br />Excavator Cycle Time (load bucket, swing loaded, dump bucket, swing empty) <br />Basic job condition description : AVERAGE <br />Secondary job condition within basic description : AVERAGE <br />Cycle time value : 0.28 minutes <br />Bucket Capacity <br />Rated bucket capacity : 1.63 LCY (heaped) Bucket size class : medium <br />Bucket fill factor : 0.85 Hard, tough clay (80% - 90%) <br />Adjusted bucket capacity : 1.39 LCY <br />Job Condition Correction Factors <br />Site altitude : 11.700 feet <br />Unadjusted hourly unit production <br />Adjusted hourly unit production <br />Adjusted hourly fleet production <br />JOB TIME AND COST <br />Fleet size : 1 excavator(s) <br />Unit cost : $0.484 per LCY <br /> Source <br />Altitude adjustment : 0.83 (Cat HB) <br />Job efficiency adjustment : 0.83 (1 shift/day) <br />Net job correction : 0.69 multiplier <br /> <br />292.71 LCY/hour <br />201.65 LCY/hour <br />201.65 LCY/hour <br />Total job time : 5.32 hours <br />Total job cost : $520 <br />