Laserfiche WebLink
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 06-Jun-2011 Permit or job no. P-2011-011 Site : East Upper Rat Creek <br />User : RCO Abbreviation : . none State : Colorado <br />Filename : P011-000 County :Mineral <br />Agency or organization name :DRMS <br />Permit or job action : New NOI <br />TASK LIST (DIRECT COSTS) FORM FLEET TASK DIRECT <br />NO. TASK DESCRIPTION USED SIZE HOURS COST <br />001 -Close and seal drill hole (1) borehole 1 10.0 $5,129 <br />002 -Backfill pad sumps (3 per pad, on 2 pads) dozer 1 0.8 $71 <br />003 -Pull up material for recontouring pads (2) excavate 1 5.3 $520 <br />004 -Recontour grading of pad areas (2) dozer 1 6.11 $492 <br />005 -Pull material onto access road for recontouring excavate 1 4.0 $393 <br />006 -Recontour grading of access road dozer 1 5.2 $425 <br />007 -Rip compaction on road and pads ripper 1 3.6 $300 <br />008 -Respread topsoil on pads and access road dozer 1 8.1 $660 <br />009 -Revegetate disturbed areas (pads and road) revege 1 12.0 $1,879 <br />010 -Haul reclamation equipment to and from site mobilize 1 7.71 $2,931 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS: 63.1 $12,800 <br />* includes inflation factor adjustment of : NA % TOTAL DIRECT COST * =I $12,800 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability insurance : 2.02 % of direct total = $259 <br />Performance bond : 1.05 % of direct total = $134 <br />Job superintendent : 31.57 hrs*...$/hr: $52.10 total = $1,645 <br />Profit : 10.00 % of direct total = $1,280 <br />* assume net hours = 50% of task hours TOTAL O & P = $3,318 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) _ $16,118 <br />Financial warranty processing (legal/related costs) : 500.00 total $ NA total = $500 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $806 <br />CONTINGENCY - NA* NA total = NA <br />* contingencies accounted for at task level <br />TOTAL INDIRECT COST = $4,624 <br />TOTAL BOND AMOUNT (direct + indirect) _ $17,424