Laserfiche WebLink
RnAnARI F F0111PMFNT sheet 2 of 2 <br />Machine <br />Description Total <br />Cost/hour/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet <br />-Water Tanker, 2,500 Gal. $84.12 1 $84.12 $84.12 <br />-Pipe/pump truck $145.00 1 $145.00 $145.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $229.12 $229.12 <br />EQUIPMENT HAUL DISTANCE and TIME <br /> Nearest major city or town within project area region : Monte Vista <br />Transportation Cycle Time : Non- Total one-way travel distance : 50.0 miles <br /> Roadable Roadable Average travel speed : 35.0 mph <br /> Equipment Equipment <br />Haul time (hours) = 1.43 1.43 Total non-roadable mob/demob cost $2,276.58 <br />Return time (hours) = 1.43 1.43 * two round trips with haul rig <br />Loading time (hours) = 0.50 NA Total roadable mob/demob cost ** : $654.64 <br />Unloading time (hours) = 0.50 NA •• one round trip, no haul rig <br />Subtotals = 3.86 2.86 <br />JOB TIME AND COST Total job time : 7.71 hours <br /> Total job cost : $2931