Laserfiche WebLink
STATE OF COLORADO <br />DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 215 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />June 9, 2011 <br />Bernard Petersen <br />Cross Mountain Ranch Ltd. Partnership <br />COLORADO <br />D I V IS I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />P.O. Box 897 Loretta E. Pineda <br />Craig, CO 81626 Director <br />RE. Kagie Gravel Pit, Permit No. M-1979-102, Reason to Believe a Violation Exists, and Failure to <br />Provide Required Financial Warranty <br />Dear Mr. Petersen: <br />On September 17, 2010 the Division of Reclamation, Mining and Safety (Division) mailed notice to you <br />requiring a financial warranty increase in the amount of $8,453.00 be submitted within 60 days for the <br />above noted operation. To date, the required additional financial warranty of $8,453. 00 has not been <br />submitted to the Division. <br />Therefore, the Division has reason to believe the Operator is in violation of the Colorado Land <br />Reclamation Act for the Extraction of Construction Materials, specifically: C.R.S. 34-32.5-117(4)(c)(II) <br />and Rule 4.2.1(2) of the Construction Materials Rules and Regulations for failure to post required <br />financial warranty within sixty (60) days of the date of notice of adjustment. <br />A Formal Public Hearing will be held during the July 13-14, 2011 Mined Land Reclamation Board <br />(Board) meeting for consideration of the possible violation. The hearing will be held in Room 318 of <br />1313 Sherman Street, Denver, Colorado, beginning at 9:00 a.m. or as soon thereafter as the matter can be <br />considered. You will have the opportunity to be represented and heard. <br />If the Board fmds a violation at this hearing, it may issue a Cease and Desist Order, assess a Civil Penalty <br />in the amount of $100.00 to $1000.00 for each day of violation, and/or order the permit be suspended, <br />modified or revoked. If you have evidence indicating that the possible violation(s) noted above do not <br />exist or have been corrected, please provide it to the Division as soon as possible or bring it to the <br />hearing. <br />Following the hearing, all parties have an opportunity to review and comment on a draft of the Board's <br />order before it becomes final. If you wish to do so, you must provide the Board with a written request to <br />review the draft order prior to or at the time of your hearing, or you must inform the Board orally during <br />the hearing that you request to review the draft order. You must include your mailing address and, if <br />possible, a fax or email address. You will be provided a copy of the draft order by e-mail for your review <br />as soon as it is available, unless a hard copy by mail is requested. The Board's attorney must receive your <br />comments on the draft order within three calendar days of the date the draft order is e-mailed, unless that <br />deadline is extended by the Board's attorney. Submit all comments in writing, by e-mail or fax, to Mr. <br />Office of Office of <br />Mined Land Reclamation Denver • Grand Junction • Durango Active and Inactive Mines