My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-08_INSPECTION - M1983141
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1983141
>
2011-06-08_INSPECTION - M1983141
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:18 PM
Creation date
6/9/2011 11:35:09 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1983141
IBM Index Class Name
INSPECTION
Doc Date
6/8/2011
Doc Name
Receipt of Corrective Action Documentation & Request for Corrective Action Date Extension.
From
DRMS
To
J.M. Beck & Associates
Inspection Date
6/12/2009
Email Name
MAC
AJW
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
STATE OF COLORADO <br />/DIVISION OF RECLAMATION, MINING AND SAFETY <br />Department of Natural Resources <br />1313 Sherman St., Room 21.5 <br />Denver, Colorado 80203 <br />Phone: (303) 866-3567 <br />FAX: (303) 832-8106 <br />44une 8, 2011 <br />Jim Beck <br />/M Beck & Associates <br />6130 W. Vassar Way <br />Lakewood, CO 80227 <br />COLORADO <br />D I V I S I ON OF <br />RECLAMATION <br />MINING <br />SAFETY <br />John W. Hickenlooper <br />Governor <br />Mike King <br />Executive Director <br />Loretta E. Pineda <br />Director <br />RE: Cash and Who Do Mines; DRMS File No. M0-'1983-141; Receipt of Corrective Action <br />Documentation & Request for Corrective Action Date Extension <br />Dear Mr. Beck, <br />The Division received your above referenced response in regard to the Compliance Problems <br />cited in the report of the inspection conducted on lune 12, 2009. The statuses of the corrective <br />actions regarding these problems are as follows: <br />Compliance Problem 1: The escape-way shaft has not been approved as part of the <br />reclamation plan. <br />At the request of the Operator, the corrective action date has been extended to August 31, 2011. <br />Please be aware that no extensions will be granted beyond the August 31, 2011 deadline. If the <br />Operator has not complied with the corrective action by the corrective action date, then <br />enforcement actions may be pursued. <br />Compliance Problem 2: Incorrect Financial Warranty Form <br />This problem is considered abated as a result of the Operator's submittal of a joint Financial <br />Warranty form between the Division and the Bureau of Land Management. <br />Compliance Problem 3: The permit boundary was inadequately marked. <br />This problem is considered abated as a result of the Operator's submittal of documentation <br />demonstrating that the permit boundary was surveyed and delineated. <br />The following problems were identified in the report of the inspection conducted on December <br />22, 2010. The statuses of the corrective actions regarding these problems are as follows: <br />Compliance Problem 1: An unpermitted dewatering well (CM-4) was observed in the Cash <br />Mine Area. <br />At the request of the Operator, the corrective action date has been extended to September 30, <br />2011. <br />Office of <br />Mined Land Reclamation <br />Denver • Grand Junction • Durango <br />Office of <br />Active and Inactive Mines
The URL can be used to link to this page
Your browser does not support the video tag.