My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-08_HYDROLOGY - M1997054
DRMS
>
Day Forward
>
Hydrology
>
Minerals
>
M1997054
>
2011-06-08_HYDROLOGY - M1997054
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:18 PM
Creation date
6/9/2011 11:35:08 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1997054
IBM Index Class Name
HYDROLOGY
Doc Date
6/8/2011
Doc Name
SWSP
From
OSE
To
Applegate Group, Inc.
Permit Index Doc Type
Hydrology Report
Email Name
BMK
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
9
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Stephen Buechner, Applegate Group <br />June 8, 2011 <br />Page 4 <br />shares of Twin Lakes Reservoir and Canal Company to cover these potential long term <br />depletions. Front Range Aggregates must continue to commit those shares to this plan <br />until such time as the State Engineer authorizes the release of this commitment. <br />10. In accordance with amendments to §25-8-202(7), C.R.S., and "Senate Bill 89-181 <br />Rules and Regulations" adopted on February 4, 1992, the State Engineer shall <br />determine if this substitute water supply plan is of a quality to meet requirements of <br />use to which the senior appropriation receiving the substitute supply has normally <br />been put. As such, water quality data or analyses may be requested at any time to <br />determine if the requirement of use of the senior appropriator is met. <br />11. The decision of the State Engineer shall have no precedential or evidentiary force, <br />shall not create any presumptions, shift the burden of proof, or serve as a defense <br />in any water court case or any other legal action that may be initiated concerning <br />the substitute water supply plan. This decision shall not bind the State Engineer to <br />act in a similar manner in any other applications involving other plans or in any <br />proposed renewal of this plan, and shall not imply concurrence with any findings of <br />fact or conclusions of law contained herein, or with the engineering methodologies <br />used by the Applicant. <br />Please contact Caleb Foy in Denver at (303) 866-3581, or Justin Zeisler in Pueblo <br />at (719) 542-3368, if you have any questions concerning this approval. <br />Since <br />-Heidi Frey, P.E. <br />Water Resource Engineer <br />Attachments: Tables 1, 2, and.3; Appendix A <br />cc: Steve Witte, Division 2 Engineer (via email) <br />Brian Sutton, District 12 Water Commissioner (via email) <br />Division of Reclamation, Mining, and Safety <br />HCF/crf: Parkdale 2009-2011.docx
The URL can be used to link to this page
Your browser does not support the video tag.