Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 02A Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AV G.) <br />0.830 (1 SHIFT/DAY) <br />0.800 (FND-RF) <br />1.329 (CAT HB) <br />1.000 (CAT HB) <br />0.793 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.4724 <br />Adjusted unit production: 768.59 LCY/hr <br />Adjusted fleet production: 768.59 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.206/LCY <br />Total job time: 27.92 Hours <br />Total job cost: $4,430.30 <br />CIRCES Cost Estimating Software