My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-03_REVISION - M1988021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988021
>
2011-06-03_REVISION - M1988021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:17 PM
Creation date
6/9/2011 8:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988021
IBM Index Class Name
Revision
Doc Date
6/3/2011
Doc Name
Amendment approval AM-01
From
DRMS
To
Soward Ranch LLC
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PROJECT IDENTIFICATION <br />Task #: 004 <br />Date : 0610212011 <br />User : RCO <br />Agency or organization name: DRMS <br />Permit or other job action :Amendment AM-1 <br />Task description :Rip compaction on pit floor <br />HOURLY EQUIPMENT COST <br />Basic machine: Cat DBR Series 11- 8SU 000: Horsepower : 310 <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab Shiftbasis : 1 per day <br />Attachment no. 2:3-shank ripper <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.54 NA <br />Dozer operating cost/hour : $70.36 100 <br />Ripper operating cost/hour : $6.29 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $168.72 Total fleet cost/hour : $168.72 <br />MATERIAL QUANTITIES <br /> Selected estimating method : Area <br />Alternate methods - <br />Seismic : NA NA Load factor : NA Bank volume : NA BCY <br />Area : 4.00 acres Rip depth (ft) : 1.00 Volume : 6,453 BCY or CCY <br /> <br />Source of estimated quantity :plan map <br />Source of estimated l oad factor : NA <br /> <br />HOURLY PRODUCTION <br />Alternate methods - Job Condition Correction Factors - <br />Seismic : Seismic velocity: NA feet/second Unadjusted production <br />Unadjusted production : NA cu. yds./hour per selected method : 1,312.35 cu. yds./hour <br /> <br />Area : Avg. ripping depth : 1.00 feet/pass Site altitude : 8,900 feet <br />Average ripping width : 7.08 feet/pass Altitude adjustment : 1.00 (Cat HB) <br />Average ripping length : 400.00 feet/pass Job efficiency factor : 0.83 (1 shift/day) <br />Average dozer speed : 88.00 feet/minute Net job correction : 0.83 multiplier <br />Average maneuver time : 0.25 minutes/pass <br />Production per unit area : 0.813 acres/hour Adjusted unit production : 1,089.25 cu. yds./hour <br />Unadjusted production : 1,312.35 cu. yds./hour Adjusted fleet production : 1,089.25 cu. yds./hour <br /> <br />JOB TIME AND COST <br />Fleet size : 1 dozer(s) Total job time : 5.92 hours <br />Unit cost : $0.155 per cu. yd. Total job cost : $999 <br /> <br />CIRCES Cost Estimating Software <br />BULLDOZER RIPPING WORK <br />State : Colorado <br />County :Mineral <br />Site : Soward Ranch Pit <br />Permit/job # : M-1988-021 <br />Abbreviation :none <br />Filename :M021-004
The URL can be used to link to this page
Your browser does not support the video tag.