My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-03_REVISION - M1988021
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1988021
>
2011-06-03_REVISION - M1988021
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:17 PM
Creation date
6/9/2011 8:11:43 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1988021
IBM Index Class Name
Revision
Doc Date
6/3/2011
Doc Name
Amendment approval AM-01
From
DRMS
To
Soward Ranch LLC
Type & Sequence
AM1
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $18.34 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $18.34 NA NA $7.89 $14.63 $8.77 $13.86 NA NA NA NA <br />-Attachment no. 2: NA NA NA $1.32 $1.35 $2.41 $1.36 NA NA NA NA <br />Annual usage : $27.67 $13.26 $12.81 NA NA NA NA NA NA NA NA <br />Double shifts : $20.75 $6.63 $6.40 NA NA NA NA NA NA NA NA <br />Triple shifts : $18.46 $4.42 $4.26 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $4.61 NA $5.12 NA NA NA NA NA <br />Attachment no. 2 : NA NA NA $0.77 NA $1.41 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $24.99 $5.41 $0.00 $2.01 <br />Attachment no. 2: NA NA NA NA NA NA NA $0.00 $0.35 $0.00 $1.13 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS <br />Single shifts : $27.67 $13.26 $12.81 $4.61 $14.63 $5.12 $13.86 $24.99 $5.41 $0.00 $2.01 <br />Double shifts : $20.75 $6.63 $6.40 ttachment no. 2 <br />Triple shifts : $18.46 $4.42 $4.26 $0.77 $1.35 $1.41 $1.36 $0.00 $0.35 $0.00 $1.13 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (-70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br />Mechanic $16.74 $4.20 $1.28 $1.04 $1.67 $24.93 Night : $0.45 <br />HO <br />URLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $53.74 $70.63 $6.37 $38.54 ,$169.27 <br />Double shifts : $33.79 $70.63 $6.37 $38.69 $149.47 <br />Triple shifts : $27.14 $70.63 $6.37 $38.79 $142.92 <br />EQUIPMENT PERFORMANCE DATA <br />Description <br />Dozer : Cat D8R Series 11 - 8SU <br />Blade : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:13-shank ripper <br /> <br />Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type <br />310 NA 41.8 22.7 8.7 11.5 diesel <br />NA NA 5.4 NA 12.9 5.5 NA <br />NA NA NA NA NA NA NA <br />NA NA 5.4 3.6 7.1 2.6 NA <br />Total weight : 52.5 (UST) <br />Ripper <br />type <br />NA <br />NA <br />NA <br />Adj. Parallelogram
The URL can be used to link to this page
Your browser does not support the video tag.