My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-02_PERMIT FILE - M2011013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011013
>
2011-06-02_PERMIT FILE - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:08 PM
Creation date
6/9/2011 8:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
PERMIT FILE
Doc Date
6/2/2011
Doc Name
F&PW request
From
DRMS
To
Telluride Stone Company Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 005 State : Colorado Permit/job #: M-2011-013 <br />Date : 06/02/2011 County : San Miguel Abbreviation : none <br />User : RCO Site : Airport Pit Filename : M013-005 <br />Agency or organization name : DRMS <br />Permit or other job action : New 112c <br />Task description : Carry topsoil to cover unusable stone <br />HOURLY EQUIPMENT COST Basic machine : CAT 938G (2003) <br />Attachment no. 1 : ROPS Cab <br />Horsepower: 160 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $22.39 NA <br />Operating cos/hour : $24.49 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $85.41 Total fleet cost/hour : $85.41 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 750 CCY factor : 1.125 volume : 844 LCY <br />Source of quantity take-off: 10% of total volume (assumed amount for 1 yr) <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (Cat HB) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.525 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HS) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : Inconsistent operation 0.040 (Cat HB) <br />Dump target :, No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : 0.040 minutes <br />Adjusted basic cycle time : 0.565 minutes <br />Rolling Resistance - Road Conditions <br />Haul : Rutted dirt, little maintenance, no water, 2" tire penetration <br />Return :Rutted dirt, little maintenance, no water, 2"tire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 5.00 5.00 10.00 0.6430 (Cat HB) <br />Return route : 300 -5.00 5.00 0.00 0.2392 (Cat HB) <br /> Total travel time : 0.8822 minutes <br />Loader Bucket Capacity Total cycle time : 1.447 minutes <br />Rated capacity : 3.25 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other - rock/dirt mixtures (100-120%) <br />Adjusted capacity : 3.58 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 1.00 (Cat HB) <br />Site altitude : 9,100 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.83 multiplier <br />Unadjusted hourly unit production : 148.22 LCY/Hr <br />Adjusted hourly unit production : 123.02 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 123.02 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 6.86 Hours <br />Unit cost : $0.694 /LCY Total job cost : $586 <br />
The URL can be used to link to this page
Your browser does not support the video tag.