My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-02_PERMIT FILE - M2011013
DRMS
>
Day Forward
>
Permit File
>
Minerals
>
M2011013
>
2011-06-02_PERMIT FILE - M2011013
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:08 PM
Creation date
6/9/2011 8:11:35 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M2011013
IBM Index Class Name
PERMIT FILE
Doc Date
6/2/2011
Doc Name
F&PW request
From
DRMS
To
Telluride Stone Company Inc.
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
16
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 002 <br />Date : 0610212011 <br />User : RCO <br />State : Colorado Permit/job# : M-2011-013 <br />County :San Miguel Abbreviation :none <br />Site :Airport Pit Filename :M013-002 <br />Agency or organization name: DRMS <br />Permit or other job action :New 112c <br />Task description :Excavate pit for waste rock <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2:3-shank ripper <br />Horsepower : 310 <br />Shift basis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br /> Operating cost/hour : $70.63 100 <br /> Ripper op. cost/hour : $0.00 0 <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 2,000 LCY factor : NA volume : 2,000 LCY <br /> <br />Source of estimate d volume : Proposed plan, amount for 1 year <br />Source of estimated swell factor : NA <br /> <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 60 feet Material consistency : 0.90 (Cat HB) <br />Unadjusted hourly production : 1,246.9 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (Ishift/day) <br />Compacted fill or embankment Spoil pile : 0.80 (fnd-rf) <br />Average push gradient <br />Average site altitude <br />Material weight <br />Weight description : <br />Decomposed rock - 50% Rock, <br />0.00 % (I <br />9,100 feet <br />2,900 Ibs/LCY <br />50% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.368 /LCY <br />Push gradient : <br />Altitude <br />Material weight : <br />Blade type <br />Net correction <br />Adjusted unit production <br />Adjusted fleet production <br />Total job time <br />Total job cost <br />1.00 (Cat HB) <br />1.00 (Cat HB) <br />0.79 (Cat HB) <br />1.00 (S/SU/U) <br />0.36 <br />443.07 LCY/hr <br />443.07 LCY/hr <br />4.51 Hours <br />$735
The URL can be used to link to this page
Your browser does not support the video tag.