Laserfiche WebLink
CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />PROJECT IDENTIFICATION <br />Task # : 008 State : Colorado Permit/job# : M-2011-013 <br />Date : 0610212011 County: San Miguel Abbreviation :none <br />User : RCO Site :Airport Pit Filename : M013-008 <br />Agency or organization name: DRMS <br />Permit or other job action :New 112c <br />Task description :Grade topsoil storage area <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D8R Series 11 - 8SU (200: <br />Blade type : Semi-Universal <br />Attachment no. 1 : ROPS Cab <br />Attachment no. 2 :3-shank ripper <br />Horsepower: 310 <br />Shiftbasis : 1 per day <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $53.74 NA <br />Operating cost/hour : $70.63 100 <br />Ripper op. cost/hour : $0.00 0 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $162.90 Total fleet cost/hour : $162.90 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 403 CCY factor : 1.125 volume : 453 LCY <br /> <br />Source of estimated volume :0.5 ac (area for one year) x 6 inch depth <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 100 feet Material consistency : 1.00 (Cat HB) <br />Unadjusted hourly production : 852.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility : 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Consolidated stockpile Spoil pile : 0.70 (fnd-mf) <br />Average push gradient : 5.00 % (neg) <br />Average site altitude : 9,100 feet <br />Material weight : 2,650 Ibs/LCY <br />Weight description : <br />Decomposed rock - 25% Rock, 75% Earth <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) <br />Unit cost : $0.453 /LCY <br />Push gradient : 1.11 (Cat HB) <br />Altitude : 1.00 (Cat HB) <br />Material weight : 0.87 (Cat HB) <br />Blade type : 1.00 (S/SU/U) <br />Net correction : 0.42 <br />Adjusted unit production : 359.53 LCY/hr <br />Adjusted fleet production : 359.53 LCY/hr <br />Total job time : 1.26 Hours <br />Total job cost : $205