Laserfiche WebLink
of C <br />COLORADO DIVISION OF RECLAMATION, MINING AND SAFEE.Tj <br />MINERALS PROGRAM INSPECTION REPORT R' auENSO <br />PHONE: (303) 866-3567 <br />JUN 0 S 2011 <br />87 <br />rli,ricinn nf F2E?CI2Cne'.•ti0n, <br />mining and SafiE'ty <br />The Division of Reclamation, Mining and Safety has conducted an inspection of the mining operation <br />noted below. This report documents observations concerning compliance with the terms of the permit <br />and applicable rules and regulations of the Mined Land Reclamation Board. <br />MINE NAME: MINE/PROSPECTING ID#: MINERAL: COUNTY: <br />Hidden Valley Gravel Pit M-1998-024 Sand and gravel Eagle <br />INSPECTION TYPE: INSPECTOR(S): INSP. DATE: INSP. TIME: <br />Monitoring Dustin M. Czapla June 2, 2011 11:00 <br />OPERATOR: OPERATOR REPRESENTATIVE: TYPE OF OPERATION: <br />B & B Excavating Jason Burkey 112c - Construction Regular Operation <br />REASON FOR INSPECTION: BOND CALCULATION TYPE: BOND AMOUNT: <br />Normal I&E Program Complete Bond $86,700.00 <br />DATE OF COMPLAINT: POST INSP. CONTACTS: JOINT INSP. AGENCY: <br />NA None None <br />WEATHER: TO S SIGNATURE: SIGNATURE DATE: <br />Clear June 7, 2011 <br />The following inspection topics were identified as having Problems or Possible Violations. OPERATORS <br />SHOULD READ THE FOLLOWING PAGES CAREFULLY IN ORDER TO ASSURE COMPLIANCE <br />WITH THE TERMS OF THE PERMIT AND APPLICABLE RULES AND REGULATIONS. If a <br />Possible Violation is indicated, you will be notified under separate cover as to when the Mined Land <br />Reclamation Board will consider possible enforcement action. <br />INSPECTION TOPIC: Financial Warranty <br />PROBLEM/POSSIBLE VIOLATION: Problem: The financial warranty is not adequate to reclaim the site in <br />accordance with the approved reclamation plan. This is a failure to maintain a proper financial warranty <br />amount to complete reclamation of the affected lands pursuant to C.R.S. 34-32.5-117(4)(b) of the Act. <br />CORRECTIVE ACTIONS: The operator shall submit adequate financial warranty, as determined by the Division. <br />A surety increase notice has been included with this report. The operator will have 60 days from the date of the <br />surety increase notice to post the additional financial warranty. <br />CORRECTIVE ACTION DUE DATE: 8/08/11 <br />Pagel of 3