Laserfiche WebLink
PROJECT IDENTIFICATION <br />Task #: 003 <br />Date : 0610212011 <br />User : RCO <br />CIRCES Cost Estimating Software <br />BULLDOZER WORK <br />State : Colorado <br />County :Ouray <br />Site : Lower Mountain Top <br />Agency or organization name: DRMS <br />Permit or other job action : New NOI <br />Task description : Shape waste rock mass on repository slope <br />HOURLY EQUIPMENT COST <br />Basic machine : Cat D6R - 6S (2003) Horsepower : 165 <br />Blade type :Straight <br /> Attachment no. 1 : ROPS Cab Shift basis : 1 per day <br /> Attachment no. 2 : NA <br /> Data source : (CRG) <br /> Utilization % <br />Cost Breakdown : Ownership cost/hour : $24.86 NA <br /> Operating cost/hour : $36.87 100 <br /> Ripper op. cost/hour : $0.00 NA <br /> Operator cost/hour : $38.54 NA <br /> Total unit cost/hour : $100.27 Total fleet cost/hour : $100.27 <br />MATERIAL QUANTITIES <br />Initial Swell Loose <br />volume : 500 LCY factor : NA volume : 500 LCY <br />Source of estimate d volume: 25% of approved total volume <br />Source of estimated swell factor :NA <br />HOURLY PRODUCTION Job Condition Correction Factors Source <br /> Operator skill : 0.75 (avg.) <br />Average push distance : 50 feet Material consistency : 0.70 (Cat HB) <br />Unadjusted hourly production : 444.6 LCY/hr Dozing method : 1.00 (gen.) <br /> Visibility: 1.00 (avg.) <br />Material consistency description : Job efficiency : 0.83 (lshift/day) <br />Rock, avg. ripped or blasted Spoil pile: 0.70 (fnd-mt) <br /> Push gradient : 0.54 (Cat HS) <br />Average push gradient : 20.00 % (pos) Altitude : 0.94 (Cat HB) <br />Average site altitude : 11,400 feet Material weight : 0.82 (Cat HB) <br /> Blade type : 1.00 (S/SU/U) <br />Material weight : 2,800 Ibs/LCY Net correction : 0.13 <br />Weight description <br />Granite - Broken Adjusted unit production : 57.03 LCY/hr <br /> Adjusted fleet production : 57.03 LCY/hr <br />JOB TIME AND COST <br />Fleet size : 1 Dozer(s) Total job time : 8.77 Hours <br />Unit cost : $1.758 /LCY Total job cost : $879 <br />Permit/job# :P-2011-009 <br />Abbreviation :none <br />Filename : P009-003