My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-01_PERMIT FILE - P2011009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011009
>
2011-06-01_PERMIT FILE - P2011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:59 PM
Creation date
6/9/2011 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011009
IBM Index Class Name
PERMIT FILE
Doc Date
6/1/2011
Doc Name
Reclamation cost estimate and NOI is approved
From
DRMS
To
Grayling LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />COST SUMMARY FORM <br />PROJECT IDENTIFICATION <br />Date : 02-Jun-2011 Permit or job no. P-2011-009 <br />User : RCO Abbreviation : none <br />Filename : P009-000 <br />Agency or organization name: DRMS <br />Permit or job action : New NOI <br />TASK LIST (DIRECT COSTS) <br />NO. TASK DESCRIPTION FORM <br />USED FLEET <br />SIZE TASK <br />HOURS DIRECT <br />COST <br />001 -Remove and dispose of debris demolish 1 2.0 $1,053 <br />002 -Carry waste rock to repository loader 1 6.3 $438 <br />003 -Shape waste rock mass on repository slope dozer 1 8.7 $879 <br />004 -Install replacement adit door, lockable mineseal 1 4.0 $1,962 <br />005 -Haul reclamation equipment to and from site mobilize 1 7.1 $1,442 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />SUBTOTALS : 28.3 $5,774 <br />• includes inflation factor adjustment of : NA <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT - Liability Insurance <br />Performance bond <br />Job superintendent <br />Profit <br />TOTAL DIRECT COST - =I $5,774 <br />2.02 % of direct total = $117 <br />1.05 % of direct total = $61 <br />NA* NA NA total = NA <br />10.00 % of direct total = $577 <br />* not required (or eqp. operator serves as super.) TOTAL O & P = $755 <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT - CONTRACT AMOUNT (direct + O & P) = $6,529 <br />Financial warranty processing (legal/related costs) : 0.00 total $ NA total = $0 <br />Engineering work and/or contract/bid preparation : NA NA NA total = NA <br />Reclamation management and/or administration : 5.00 % of cntr. NA total = $326 <br />CONTINGENCY - NA* NA total = NA <br />contingencies accounted for at task level TOTAL INDIRECT COST = $1,081 <br />TOTAL BOND AMOUNT (direct + indirect) _ $6,855 <br />Site : Lower Mountain Top <br />State : Colorado <br />County :Ouray
The URL can be used to link to this page
Your browser does not support the video tag.