My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-01_PERMIT FILE - P2011009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011009
>
2011-06-01_PERMIT FILE - P2011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:59 PM
Creation date
6/9/2011 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011009
IBM Index Class Name
PERMIT FILE
Doc Date
6/1/2011
Doc Name
Reclamation cost estimate and NOI is approved
From
DRMS
To
Grayling LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost: $4.75 NA NA NA NA NA NA NA NA NA NA <br />Economic life - Loader and ROPS : $4.75 NA NA $2.08 1.93 $2.63 $1.75 NA NA NA NA <br />- Attachment No. 2: NA NA NA $0.00 0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $6.89 $3.09 $2.77 NA NA <br />t NA NA NA NA NA NA <br />Double shifts : $5.17 $1.55 $1.39 NA NA NA NA NA NA NA NA <br />Triple shifts : $4.60 $1.03 $0.92 NA NA NA NA NA NA NA NA <br />Mechanic Labor - Loader and ROPS : NA NA NA $1.21 NA $1.54 NA NA NA NA NA <br />Attachment No. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube - Loader : NA NA NA NA NA NA NA $7.73 $1.49 $1.37 $0.23 <br />Attachment No. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Loader, ROPS and Attachments : Loader and ROPS : <br />Single shifts : $6.89 $3.09 $2.77 $1.21 $1.93 $1.54 $1.75 $7.73 $1.49 $1.37 $0.23 <br />Double shifts : $5.17 $1.55 $1.39 ttachment no. 2: <br />Triple shifts : $4.60 $1.03 $0.92 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Loader operator (<=6cy $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day, <br />verage <br />Loader operator (> 6cy $23.82 $9.22 $1.82 $1.48 $2.38 $38.72 Swing : $0.30 Three shift per day average : $0.25 <br /> <br />Mechanic <br />$16.74 <br />$4.20 <br />$1.28 <br />$1.04 <br />$1.67 <br />$24.93 <br />Night : <br />$0.45 - <br />1URLY EQUIPMENT COST SUMMARY Ownership Operating and Overhaul <br />Machine Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $12.76 $17.25 $0.00 $38.54 $68.54 <br />Double shifts : $8.10 $17.25 $0.00 $38.69 $64.04 <br />Triple shifts : $6.55 $17.25 $0.00 $38.79 $62.59 <br />QUIPMENT PERFORMANCE DATA Machine Machine Machine Machine <br /> Horsepower length width height weight <br />Machine description Transmission type Fuel type (fhp) (ft) (ft) (ft) (UST) <br />CAT 914G NA Diesel 90.0 20.83 7.95 10.17 8.10 <br /> Minimum Struck Heaped Maximum Basic <br /> turning capacity capacity loading cycle time <br /> Bucket type circle (ft.) (cy) (cy) height (ft.) (min.) <br />Loader bucket : GP with teeth 34.33 1.50 1.70 8.83 0.475 <br /> Ground speeds (fpm) at rated engine RPM <br /> Transmission gear: 1st 2nd 3rd 4th <br /> forward : 493 1,910 NA NA <br /> reverse : 493 1,910 NA NA
The URL can be used to link to this page
Your browser does not support the video tag.