My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-01_PERMIT FILE - P2011009
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011009
>
2011-06-01_PERMIT FILE - P2011009
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:59 PM
Creation date
6/9/2011 7:42:24 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011009
IBM Index Class Name
PERMIT FILE
Doc Date
6/1/2011
Doc Name
Reclamation cost estimate and NOI is approved
From
DRMS
To
Grayling LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
14
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ADJUSTED COSTS Ownership Costs <br /> <br />Depreciation CFC Overhead Overhaul and Operating Costs sheet 2 of 2 <br />Overhaul Field Repair <br />Labor Parts Labor Parts Fuel Lube Tires G.E.C. <br />Acquisition cost : $742 NA NA NA NA NA NA NA NA NA NA <br />Econ.life -Dozer and ROPS : $7.42 NA NA $4.71 $6.51 $5.81 $6.31 NA NA NA NA <br />-Attachment no. 2: NA NA NA $0.00 $0.00 $0.00 $0.00 NA NA NA NA <br />Annual usage : $12.20 $6.79 $5.87 NA NA NA NA NA NA NA NA <br />Double shifts : $9.15 $3.39 $2.93 NA NA NA NA NA NA NA NA <br />Triple shifts : $8.14 $2.26 $1.95 NA NA NA NA NA NA NA NA <br />Mechanic labor-Dozer and ROPS : NA NA NA $2.75 NA $3.39 NA NA NA NA NA <br />-Attachment no. 2 : NA NA NA $0.00 NA $0.00 NA NA NA NA NA <br />Fuel/lube -Dozer and ROPS : NA NA NA NA NA NA NA $14.16 $2.84 $0.00 $0.91 <br />Attachment no. 2 : NA NA NA NA NA NA NA $0.00 $0.00 $0.00 $0.00 <br />ADJUSTED COST SUBTOTALS <br /> <br />Depreciation Ownership Costs <br /> <br />CFC <br /> <br />Overhead <br />Overhaul <br />Labor Parts Overhaul and Operating Costs <br />Field Repair <br />Labor Parts Fuel Lube Tires G.E.C. <br />Dozer, ROPS and Attachment no. 2: Dozer and ROPS : <br />Single shifts : $12.20 $6.79 $5.87 $2.75 $6.51 $3.39 $6.31 $14.16 $2.84 $0.00 $0.91 <br />Double shifts : $9.15 $3.39 $2.93 ttachment no. 2 <br />Triple shifts : $8.14 $2.26 $1.95 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 $0.00 <br />HOURLY OPERATOR WAGES Base Fringe F.I.C.A. Unempl. Wk.Comp. Total <br /> Rate Benefits 7.65% 6.20% 10.00% ($/hr) Shift Differential Colorado labor zone : 2 <br />Dozer operator (< 70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Day : $0.00 Two shift per day average : $0.15 <br />Dozer operator (>=70hp $23.67 $9.22 $1.81 $1.47 $2.37 $38.54 Swing : $0.30 Three shift per day average : $0.25 <br /> <br />Mechanic <br />$16.74 <br />$4.20 <br />$1.28 <br />$1.04 <br />$1.67 <br />$24.93 <br />Night : <br />$0.45 - <br />HOURLY EQUIPMENT COST SUMMARY Ownership Operatin <br />Machine g and Overhaul <br />Attachments Operator Total <br />Cost/hr ($) <br />Single shifts : $24.86 $36.87 $0.00 $38.54 $100.27 <br />Double shifts : $15.48 $36.87 $0.00 $38.69 $91.04 <br />Triple shifts : $12.35 $36.87 $0.00 $38.79 $88.01 <br />EQUIPMENT PERFORMANCE DATA <br />Description Horsepower <br />(FHP) Transmission <br />Type Weight <br />(UST) Length <br />(ft) Width <br />(ft) Height <br />(ft) Fuel <br />type Ripper <br />type <br />Dozer : Cat D6R - 6S (2003) 165 NA 20.0 16.8 8.0 10.5 diesel NA <br />Blade : Straight NA NA 2.9 NA 11.0 4.1 NA NA <br />Attachment no. 1 : BOPS Cab NA NA NA NA NA NA NA NA <br />Attachment no. 2 : NA NA NA NA NA NA NA NA NA <br /> Total weight : 22.9 (UST)
The URL can be used to link to this page
Your browser does not support the video tag.