Laserfiche WebLink
-4- <br />12. Primary future (Post-minine) land use (check one): <br />Cropland(CR) Pastureland(PL) <br />? Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />General Agriculture(GA) <br />_ Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />Solid Waste Disposal(WD) <br />13. Primary present land use (check one): <br />Cropland(CR) Pastureland(PL) <br />? Rangeland(RL) Forestry(FR) <br />Residential(RS) Recreation(RC) <br />Developed Water Resources(WR) <br />_ General Agriculture(GA) <br />Wildlife Habitat(WL) <br />Industrial/Commercial(IC) <br />14. Method of Mining: Briefly explain mining method (e.g. truck/shovel): <br />This is a dry mining operations using, dozers, loaders, track hoes & trucks. <br />15. On Site Processing: ? Crushing/Screening <br />13.1 Briefly explain mining method (e.g. truck/shovel): <br />Material is removed from the mining face using loaders and delivered to the processing plant. <br />List any designated chemicals or acid-producing materials to be used or stored within permit area: <br />None <br />16. Description of Amendment or Conversion: <br />If you are amending or converting an existing operation, provide a brief narrative describing the proposed change(s). <br />This amendment is to add 28.54 acres to the permit area increasing the permitted reserves and <br />extend the life of the mine. The new area is located to the east of the existing permit area. The <br />reclamation plan will remain unchanged with the exception that the power lines now bisecting <br />the old permit area may be removed, at which time the area under the lines will be mined. In <br />addition, it may be practical to join the floors of this mine with an adjoining Morrow mine along <br />the north side. This will be done if the other mine operator modifies their permit to allow <br />removing the adjoining slope and setbacks on their property.