My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1984014 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984014
>
2011-06-06_REVISION - M1984014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:17 PM
Creation date
6/8/2011 8:16:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
Revision
Doc Date
6/6/2011
Doc Name
Amendment App. (AM-01) Attachment A Drainage Plan, Rule 6.5 & Spill Prevention
From
Cotter Corporation
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD-8 Mine - Drainage Design Plan i <br />0 TABLE OF CONTENTS <br />1. INTRODUCTION .................................................................................................................................... 1 <br />2. EXISTING DRAINAGE CONDITIONS ................................................................................................. 1 <br />2.1 Runoff Areas ......................................................................................................................... 1 <br />2.2 Design Criteria and Design Storms ....................................................................................... 5 <br />2.3 Peak Discharge Estimates for Mine Runoff Areas ................................................................ 5 <br />2.4 Existing Stormwater Retention and Routing Capacity .......................................................... 7 <br />3. OPERATIONAL AND POST-MINING DRAINAGE CONDITIONS ................................................... 7 <br />3.1 Runoff Areas ......................................................................................................................... 8 <br />3.2 Stormwater Retention and Routing Capacity ........................................................................ 9 <br />4. REFERENCES ....................................................................................................................................... 11 <br />LIST OF TABLES <br />Table 1. Upland Non-Contributing Drainage Areas ....................................................................................... 1 <br />Table 2. Drainage Basin Areas at the JD-8 Mine under Current Conditions ................................................ 3 <br />• Table 3. Recurrence Interval for Design Storms ............................................................................................ 5 <br />Table 4. Runoff from Site Basins for 10-yr 24-hour Storm Calculated Using SCS method for Design <br />Storms ........................................................................................................................................... 6 <br />Table 5. Runoff from Site Basins for 100-yr 24-hour Storm Calculated Using SCS method for Design <br />Storms ........................................................................................................................................... 6 <br />Table 6. Planned Dimensions for the Expanded East Stormwater Retention Pond ....................................... 7 <br />Table 7. Planned Dimensions for the West Stormwater Retention Pond ....................................................... 7 <br />Table 8. Calculated Runoff from the 10-year 24-hour and 100-year 24-hour Storms based on Planned Final <br />Topography ................................................................................................................................... 8 <br />Table 9. Preliminary Dimensions for the Operational and Post-Mining Stormwater Retention Pond........... 9 <br />LIST OF FIGURES <br />Figure 1. Upland Non-Contributing Drainage Areas ..................................................................................... 2 <br />Figure 2. Stormwater Drainage Areas at the JD-8 Mine ................................................................................ 4 <br />Figure 3. Post-Mining Stormwater Routing Plan ......................................................................................... 10 <br />LIST OF PHOTOS <br />Photo 1. Photo of Berm and Cutoff Ditch on Access Road Southeast of JD-8 Mine Site <br />Photo 2. Eastern Portion of Waste Rock Pile Showing Constructed Catchment and Perimeter Berms for <br />Drainage Control <br />• Photo 3. Western Portion of Waste Rock Pile Showing Former Rivulet and Small Gully that was Mitigated <br />by Repairing the Crest Berm <br />4122A.110601 Whetstone Associates 4
The URL can be used to link to this page
Your browser does not support the video tag.