My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1984014 (7)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1984014
>
2011-06-06_REVISION - M1984014 (7)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 2:24:17 PM
Creation date
6/8/2011 8:16:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1984014
IBM Index Class Name
Revision
Doc Date
6/6/2011
Doc Name
Amendment App. (AM-01) Attachment A Drainage Plan, Rule 6.5 & Spill Prevention
From
Cotter Corporation
To
DRMS
Type & Sequence
AM1
Email Name
GRM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
JD-8 Mine - Drainage Design Plan 9 <br />• 3.2 Stormwater Retention and Routing Capacity <br />The preliminary dimensions for the westernmost stormwater retention pond are shown in Figure 3 and <br />Table 9. The proposed volume of 16,890 ft3 exceeds the calculated runoff from the 10-year 24-hour storm <br />by 31% (without freeboard) and would retain 63% of the 100-year 24-hour storm. A riprap spillway would <br />be constructed with a riprap apron to convey excess flows associated with the 100-year 24-hour storm. <br />Table 9. Preliminary Dimensions for the Operational and Post-Mining Stormwater <br />Retention Pond <br />Area of Catchment 8627.316 ftZ <br />Area of Floor (511:1 V slopes) 3,375 ftZ <br />Perimeter of floor 300.6 ft <br />Depth (avg) 3.0 ft <br />Volume 16,890 ft3 <br />Volume 0.388 acre-ft <br />Volume 126,340 gallons <br />• <br />E <br />4122A.110601 Whetstone Associates
The URL can be used to link to this page
Your browser does not support the video tag.