Chief Drainage Channel Reclamation Work Plan <br />Little Deadwood Gulch <br />3. Excavate the bottom and sides of the channel 24 inches below grade to <br />allow for the placement of filter fabric (12 ozsa/vd.) foundation material, <br />filter fabric and riprap as shown in the typical cross section; <br />4. Place riprap evenly to the lines and grades shown on the drawings and <br />staked in the field; <br />5. As necessary use manual labor to restore original stream channel <br />6. Grade excavated material in designated area (Estimated amount of rock to <br />be stored is 250-300 cubic yards.); <br />7. On the down gradient side of the graded material, install a silt fence; <br />8. Reclaim the stream channel, banks and adjacent disturbed areas using the <br />following guidelines. (Guidelines for vegetation, mulch, erosion control <br />matting, straw bale barrier, silt fences are attached for reference purposes; <br />9. Manually grade or use a small Bobcat or suitable alternative front end <br />loader/box grader to conform the disturbed area to conform to the existing <br />topographic contour <br />10. Place riprap in the stream channel such that the stream bottom is <br />adequately protected to prevent downstream erosion and sedimentation <br />impacts. <br />11. No topsoil is available on site-however where fines are available and <br />where seeds can take hold. Areas on the historical mine site using this <br />technique have been successful <br />12. Revegetate the area adjacent to the constructed channel using DRMS <br />approved seed mix (Refer to Appendix A-NRCS Seed Mix). <br />13. Place jute netting or mulch over seed; <br />14. Apply straw mulch and crimp the straw into the surface-where disturbed slopes <br />of are greater 2.5:1-erosion control mats will be installed; <br />15. Install rock dams/weir above the disturbed areas (See Appendix A-BMP <br />rock dams) <br />16. On the down gradient channel install riprap at the crest of the transition <br />from the riprap channel to the out slope rock fill. <br />17. When the area has been graded and revegetated, ensure appropriate <br />erosion and sedimentation control structures are in place such as jute <br />netting, silt fences, vegetative filters, straw bales, wattles, riprap etc. <br />18. Photo document reclamation-stream restoration activities; and <br />19. Prepare "as-built" drawings <br />Inspection and Maintenance <br />20. Inspect the reclaimed site on a monthly basis-Refer to Guidance <br />Documents for potential areas requiring inspection; and <br />21. Repair failed areas as needed (repairs will be summarized in Wildcat <br />Mining Corporation annual report) <br />References <br />Guidelines for Reclamation of Drainage Basins and Channels <br />Revised 6.6.2011 <br />5