My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (49)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (49)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:13 PM
Creation date
6/7/2011 9:30:16 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to CN-01 3rd addequacy issues for 112d-1 application part 3 attachment J thru P
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
146
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
May Day Idaho Mine Complex 112 (d) Permit Application <br />• Total Organic Carbon (TOC) <br />• Total Recoverable (instead of dissolved) <br />o Barium <br />o Beryllium <br />o Boron <br />Surface water monitoring will continue for the remaining fifth quarters and will be <br />conducted in accordance with the methodology described in Attachment T-5. <br />Groundwater monitoring will be in accordance with the performance standard outlined in <br />Section 6.4.20(19). <br />6.4.20(13) Climate <br />As there are no liquid containment systems open to the environment and intended to <br />contain, manage or treat designated chemicals or acid mine drainage on-site, this <br />Environmental Protection Plan (EPP) rule is not required or applicable to the mine site <br />6.4.20(14) Geochemical Data and Analysis <br />(a) Site Specific <br />Data presented in this section was collected from materials generated from the permit <br />area. <br />(b) Representative Materials <br />Materials were collected and analyzed from mined rock currently stored at the May Day <br />No. 1 bench. Ore sampling details for the analyzed run of mine ore are presented in <br />the May Day Idaho Mine Permit Application submitted on September 29, 2010 <br />Attachment T-7. <br />As Phases 2 and 3 mining to expands-representative ore material)-.will be analyzed <br />quarterly or every 5000 tons whichever occurs first for the first year to statistically <br />geochemically characterize run of mine rock and ore. In addition, Wildcat Mining <br />Corporation will conduct a humidity cell test. The following table provides the <br />humidity test protocols for analytes and frequency of analyses. The operator <br />must refer to ASTM method D5744-07 for the required testing methodology. <br />As this is a standardized ASTM test, there are certified laboratories available <br />that have the capability and expertise to conduct this type of test. <br />Week Parameters Frequency <br />0 pH, alkalinity, sulfate, Ca, Fe, K, Mg, Na, Al, As, <br /> Zn <br />1 pH, alkalinity, sulfate, Ca, Fe, K, Mg, Na, Al, As, <br />REVISED June 5, 2011 <br />May Day Idaho Mine Complex 112(d) Permit Application <br />September 21, 2010 <br />14
The URL can be used to link to this page
Your browser does not support the video tag.