Laserfiche WebLink
CHECK DAMS <br />Fi <br />Stake 4lnches <br />Gravel bags <br />5 inches x T Finished Concentrated Flow <br />5 inches T Grade <br />Notch <br />ELEVATION <br />NOTCH DETAIL SECTION <br />Note_ <br />1. Spillway depth 'd' should be maintained <br />to prevent flanking of concentrated flow <br />around the ends at chock dams. <br />TEMPORARY CHECK DAM (TYPE 2) <br /> 10 feet Min <br />Fiber rail <br />chock dam M°x ravel Bag <br /> a m chock dam <br />Finished grade <br /> `- -- Finished grade <br />End of <br />chock dam End <br /> chock <br />k dam <br />ch <br /> <br />?° Unlined ditch <br />d=6 inches Min <br /> or swale <br />e <br /> G Spillway <br />o° <br />PERSPECTIVE <br />TEMPORARY CHECK DAM (TYPE 2) <br />DATE: 4142011 <br />SECTION PLAN <br />STAKING AND LASHING DETAIL <br />PERSPECTIVE D= pipe diameter or span <br />TEMPORARY CHECK DAM (TYPE 1)