My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-06_REVISION - M1981185 (61)
DRMS
>
Day Forward
>
Revision
>
Minerals
>
M1981185
>
2011-06-06_REVISION - M1981185 (61)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
6/15/2021 5:58:14 PM
Creation date
6/7/2011 8:03:48 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1981185
IBM Index Class Name
REVISION
Doc Date
6/6/2011
Doc Name
Response to 2nd & 3rd geotechnical adequacy issues (CN-01)
From
R Squared Inc.
To
DRMS
Type & Sequence
CN1
Email Name
WHE
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
36
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Response to Preliminary and Secondary Issues April 28, 2011 <br />Question #26- March 7,2011-Peter Hays, Tim Cazier <br />Please clarify the Applicant's definition of "roadway fill " in the R2 Inc report Does this apply <br />to only the road surface or also to the out slope fill <br />Response #26- March 7, 2011 Peter Hays, Tim Cazier <br />As used in the Geotechnical Reconnaissance report, roadwav fill is defined as fill, placed and <br />compacted as described in the Construction Work Plan, in the roadway footprint between the <br />underlying stiff natural soil or rock and the roadway subgrade It includes `out slope fill', but <br />only in the zone between the underlying natural soil/rock and the roadway subgrade <br />Question #27- March 7, 2011 Peter Hays, Tim Cazier <br />The reconnaissance report recommends the Applicant construct new fill slopes no steeper than <br />1.5.1. Please commit to removing all existing road fill including slopes and existin timber <br />crabbing structures to implementing the required work plan to reconstruct the access road <br />Response#27 March 7,2011-Peter Hays, Tim Cazier <br />Existing road fill and loose fill on existing slopes bevond the roadwav fill will be removed as <br />Part of the construction of the access road Unstable existing timber cribbing structures will <br />also be removed and replaced as necessary to achieve the required roadwav widths and m <br />conform to the specifications <br />Design specifications are presented in Attachment F CLC Road Design Third Adeguacy <br />Response regarding stabilization, road fill, grading and BMPs <br />Adequacy Issue #9 Geotechnical Stability Response to DRMS-April 18, 2011 Comments <br />On page 2 in the new Access Road - road stability including cut slope section, the Applicant <br />states the road construction work plan is presented in Mine Plan Road Exhibit D. Exhibit D Mine <br />Plan (Attachment E-1) does not contain a road construction work plan and instead references <br />Exhibit 6.5 - Geotechnical Stability as the location of the work plan. Please explain this <br />discrepancy. <br />Response #9 Geotechnical Stability Response to DRMS-April 18, 2011 Comments <br />The road construction design and construction work plan is presented in Attachment F <br />CLC Road Design-- Third Adequacy Response and replaces previously submitted access <br />road designs prepared by Sakura Engineering <br />Exhibit E - Reclamation Plan (Attachment E-2) Geotechnical Stability Response to DRMS-April <br />18, 2011 Comments <br />Response-Second and Third Geotechnical Issues 10 5/27/2011
The URL can be used to link to this page
Your browser does not support the video tag.