Response to Preliminary and Secondary Issues April 28, 2011 <br />Question #26- March 7,2011-Peter Hays, Tim Cazier <br />Please clarify the Applicant's definition of "roadway fill " in the R2 Inc report Does this apply <br />to only the road surface or also to the out slope fill <br />Response #26- March 7, 2011 Peter Hays, Tim Cazier <br />As used in the Geotechnical Reconnaissance report, roadwav fill is defined as fill, placed and <br />compacted as described in the Construction Work Plan, in the roadway footprint between the <br />underlying stiff natural soil or rock and the roadway subgrade It includes `out slope fill', but <br />only in the zone between the underlying natural soil/rock and the roadway subgrade <br />Question #27- March 7, 2011 Peter Hays, Tim Cazier <br />The reconnaissance report recommends the Applicant construct new fill slopes no steeper than <br />1.5.1. Please commit to removing all existing road fill including slopes and existin timber <br />crabbing structures to implementing the required work plan to reconstruct the access road <br />Response#27 March 7,2011-Peter Hays, Tim Cazier <br />Existing road fill and loose fill on existing slopes bevond the roadwav fill will be removed as <br />Part of the construction of the access road Unstable existing timber cribbing structures will <br />also be removed and replaced as necessary to achieve the required roadwav widths and m <br />conform to the specifications <br />Design specifications are presented in Attachment F CLC Road Design Third Adeguacy <br />Response regarding stabilization, road fill, grading and BMPs <br />Adequacy Issue #9 Geotechnical Stability Response to DRMS-April 18, 2011 Comments <br />On page 2 in the new Access Road - road stability including cut slope section, the Applicant <br />states the road construction work plan is presented in Mine Plan Road Exhibit D. Exhibit D Mine <br />Plan (Attachment E-1) does not contain a road construction work plan and instead references <br />Exhibit 6.5 - Geotechnical Stability as the location of the work plan. Please explain this <br />discrepancy. <br />Response #9 Geotechnical Stability Response to DRMS-April 18, 2011 Comments <br />The road construction design and construction work plan is presented in Attachment F <br />CLC Road Design-- Third Adequacy Response and replaces previously submitted access <br />road designs prepared by Sakura Engineering <br />Exhibit E - Reclamation Plan (Attachment E-2) Geotechnical Stability Response to DRMS-April <br />18, 2011 Comments <br />Response-Second and Third Geotechnical Issues 10 5/27/2011