June 1,2011 C-1994-082/Yoast Mine SLB <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> N -Air Resource Protection Y -Roads <br /> N -Availability of Records N -Reclamation Success <br /> Y -Backfill&Grading N -Revegetation <br /> NA -Excess Spoil and Dev. Waste NA -Subsidence <br /> NA -Explosives R -Slides and Other Damage <br /> N -Fish&Wildlife N -Support Facilities On-site <br /> R -Hydrologic Balance N - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> NA -Other NA - Special Categories Of Mining <br /> NA -Processing Waste N -Topsoil <br /> COMMENTS <br /> This was a partial inspection of the Yoast Mine based on aerial photographs of the site taken June 1, 2011. The <br /> photographs were taken by Harry Ranney of DRMS, and reviewed by Susan Burgmaier in the DRMS Denver <br /> office on June 3, 2011. Weather conditions for the flight were clear. A few snow drifts remain on the upper areas, <br /> and the area was still wet with snowmelt. Ponds 11 A,012, and 012A, Haul Road B,portions of the South Pit area <br /> and the North pit were all photographed. <br /> HYDROLOGIC BALANCE -Rule 4.05❑[]Drainage Control 4.05.1,4.05.2, 4.05.3; Siltation Structures 4.05.5, <br /> 4.05.6; Discharge Structures 4.05.7,4.05.10; Diversions 4.05.4; Effluent Limits 4.05.2; Ground Water <br /> Monitoring 4.05.13; Surface Water Monitoring 4.05.13; Drainage—Acid and Toxic Materials 4.05.8; <br /> Impoundments 4.05.6,4.05.9; Stream Buffer Zones 4.05.18: <br /> Ponds 1 IA, 012, and 12A were all holding water,but any sign of discharge was not apparent. <br /> There was a large sediment delta at the base of the gully(previously reported in the May 17,2011 inspection)that <br /> appeared to be deposited in an area not approved for disturbance. This area will be further investigated during the <br /> next on-the-ground inspection. <br /> SLIDES and DAMAGE -Rule 4.12: <br /> The Pond 012 slide had increased since the May 17, 2011 inspection;recent movement was observed on <br /> the north side of the pond,along the original repair area. The Pond 013 slide did not appear to have moved since <br /> the last inspection,but it did appear that water was still seeping through the slide material, as evidenced by <br /> standing water at the toe of the slide. A recent slump had developed on the slope above(southeast side)Pond <br /> 12A. A crack,roughly 1000 feet long was observed running through the 2006-1 shrub area. The slide along Haul <br /> Road B did not appear to have moved since the last inspection,but it also had standing water along the toe area. <br /> OTHER(SPECIFY) <br /> Number of Partial Inspection this Fiscal Year: 10 <br /> Number of Complete Inspections this Fiscal Year: 3 <br /> Page 2 of 7 <br />