My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-03_REVISION - C2009087
DRMS
>
Day Forward
>
Revision
>
Coal
>
C2009087
>
2011-06-03_REVISION - C2009087
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:11 PM
Creation date
6/6/2011 9:04:53 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2009087
IBM Index Class Name
REVISION
Doc Date
6/3/2011
Doc Name
Letter & Application
From
Peabody Sage Creek Mining, LLC
To
DRMS
Type & Sequence
MR3
Email Name
JDM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
7
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Peab!Rtq <br />Peabody Sage Creek Mining, UC <br />June), 2011 <br />rs, rr-"® <br />JUN 0 rz1) 2011 <br />pivisaon of Ke S? ? n, <br />Mining and Mr. Jason Musick <br />Colorado Division of Reclamation Mining & Safety (DRMS) <br />1313 Sherman Street, Room 215 <br />Denver CO 80203 <br />Peabody Sage Creek Mine <br />PO Box 250 <br />36600 Routt County Road 27 <br />Hayden, CO. 81639 <br />Re: Peabody Sage Creek Mine (Permit No. C-2009-087) <br />Minor Revision (MR04-11) Minor Disturbance Boundary Re-alignment for a <br />Portion of Haul Road B and Insertion of Well Permit 284387 (COV011) into the <br />PAP <br />Mr. Musick: <br />Peabody Sage Creek Mining (PSCM) is submitting MR04 for approval to move the approved <br />proposed disturbance boundary to include approximately 0.9 additional acres of disturbance <br />along a portion of Haul Road B. This additional disturbance is needed to allow adequate <br />widening of a portion of Haul Road B and not impact the existing fill slope along Pond 002. <br />Map 2.05.3 M1B, Mine Facilities Map (North Area) is attached showing the additional <br />disturbance. Based on a review of the current reclamation bond estimate there should be no <br />increase in the bond since Haul Road B has already been bonded for reclamation (i.e. road <br />reduction, topsoiling and seeding, etc). <br />In addition, a copy of DWR Well Permit 284387 is attached for insertion into the PAP. <br />We would appreciate your consideration and cooperation in facilitating timely review and <br />approval of this submittal. Once you have had opportunity to review this submittal package, <br />please feel free to contact me at 970-276-7003 with any questions or comments. <br />Best regards, <br />Mike Ludlow <br />Project Manages <br />Peabody Sage Creek Mining LLC <br />Peabody Sage Creek Mine <br />cc: Jennifer Maiolo (BLM) <br />Foster Kirby (OSMRE)
The URL can be used to link to this page
Your browser does not support the video tag.