Laserfiche WebLink
{ <br />Photo 1: Tom Peterson, measuring the top width of the North Tributary East Pit Ditch. This ditch was <br />measured to an upper width of approximately 33 feet (11/512010). <br />Photo 2: Tom Peterson, standing in the middle and bottom of the NTEPD for a scale measurement of the <br />respective ditch. Ditch dept is approximately 6 feet (11/5/2010). <br />2