Laserfiche WebLink
June 2,2011 C-1981-028/Keenesburg Strip Mine RDZ <br /> Inspection Topic Summary <br /> NOTE: Y=Inspected N=Not Inspected R=Comments Noted V=Violation Issued NA=Not Applicable <br /> Y -Air Resource Protection R -Roads <br /> N -Availability of Records R -Reclamation Success <br /> N -Backfill&Grading Y -Revegetation <br /> NA -Excess Spoil and Dev. Waste NA -Subsidence <br /> NA -Explosives NA -Slides and Other Damage <br /> N -Fish&Wildlife R -Support Facilities On-site <br /> R -Hydrologic Balance R - Signs and Markers <br /> Y -Gen. Compliance With Mine Plan NA - Support Facilities Not On-site <br /> R -Other NA - Special Categories Of Mining <br /> NA -Processing Waste N -Topsoil <br /> COMMENTS <br /> The weather was clear and windy. The ground was dry. <br /> The partial coal inspection entailed observation of the site with Don MacDonald. <br /> At the B Pit, a dozer was seen covering ash with soil. <br /> HYDROLOGIC BALANCE -Rule 4.05: <br /> CEC records indicated that there had been 1.18 inches of rain on May 30,2011. Standing water was observed in <br /> Sediment Pond 2 and the B Pit(the Dugout Pond was not observed closely enough to see if it contained standing <br /> water). Neither pond was discharging. No problems were observed with the two ponds,the pit,or any other <br /> stormwater infrastructure. <br /> ROADS—Rule 4.03: <br /> The roads between Sediment Pond 2 and the B Pit and between the B Pit and the Dugout Pond were observed <br /> during the inspection and found to be stable and well graded. The ditches were functioning,and no compliance <br /> issues were identified. <br /> RECLAMATION SUCCESS -Rule 4.15,Rule 3: <br /> Much of the site was viewed from a vehicle. Areas 29, 30,and 31 were observed on foot. Area 31 still has large <br /> bare areas(it was seeded in 2009),and cheat grass was prevalent in many areas,however no compliance issues <br /> were identified. <br /> SUPPORT FACILITIES -Rule 4.04: <br /> Observations during the inspection indicated that the facilities, including the shop and yard,are in good shape. <br /> Number of Partial Inspection this Fiscal Year: 8 <br /> Number of Complete Inspections this Fiscal Year: 4 <br /> Page 2 of 4 <br />