Laserfiche WebLink
Page 6 of 6 <br />The Division has no further concerns. Sections 2.05.6(3) and 2.04.11(4) were revised in the <br />submittal dated April 11, 2011. <br />94. In the Probable Hydrologic Consequences Section 2.05.6(3)(b)(iii) on permit text pages 2.05- <br />49 and 2.05-50, it is stated that surface water is unlikely to recharge the alluvial ground water <br />system and some general assumptions are provided. Please add specific information to the <br />discussion that supports this assertion. <br />The Division has no further concerns. BRL added information concerning evaporation, <br />infiltration and pond operations to revised permit text pages 2.05-52 and 53 in the April 11, <br />2011 submittal. <br />95. In Section 2.05.6(3)(b)(iv) on permit text page 2.05-58, it is stated that water monitoring <br />records will be maintained on site and submitted to the Division annually. Please add that the <br />discharge monitoring reports for the NPDES permit will be submitted to the Division on a <br />quarterly basis, as required in Rule 4.13(2)(a)(iii). <br />The Division has no further concerns. In the April 11, 2011 submittal, revised page 2.05-62 <br />was amended. <br />98. Please add total hardness, flow, lab ph and lab conductivity to the list of surface water <br />sampling parameters in Table 2 on permit text page 2.05-57 of Section 2.05.6(3)(b)(iv). <br />Table 2 on revised permit text page 2.05-61 was amended to include total hardness and flow. <br />However, lab ph and lab conductivity were not added to the table. Please explain. <br />99. Please add measurement units to each of the constituents listed in Table 2 on permit text page <br />2.05-57 of Section 2.05.6(3)(b)(iv). <br />The Division has no further concerns. Measurement units were added to Table 2 on revised <br />permit text page 2.05-61 in the submittal dated April 11, 2011. <br />c: /word2007/fruita/newappmemo2B