Laserfiche WebLink
6 (FORM 2 - Public filing) <br />8. Describe the estimated topsoil depth and how topsoil will be salvaged, stockpiled and redistributed for the re-establishment of <br />vegetation. Specify approximate topsoil redistribution depth: <br />The area to be disturbed is covered by 1 ft to 6 ft of old mill tailings sands. No topsoil will <br />be disturbed by is activity. <br />9. Describe how drill holes will be plugged (refer to Rule 5.4 of the Rules for required abandonment procedures): <br />The drill holes will be closed as described in the attached letter from Trautner Geotech <br />LLC. <br />10. Describe how portals, adits, shafts, ponds, excavations, or other disturbances will be reclaimed (refer to Rule 3 and Rule 5 for <br />specific reclamation performance standards). You may wish to contact the Division for closure specifications. <br />None. <br />11. Describe how roads will be reclaimed or returned to their pre-prospecting (or better) condition: <br />None