Laserfiche WebLink
4 (FORM 2 - Public filing) <br />11. Describe proposed surface excavation or other land disturbance, including roads, pits, trenches, waste piles, drill pads and <br />collar areas of underground workings, ponds, etc... <br />Drill 10 - 6 inch diameter vertical holes with hollow auger drill string up to 60 feet deep thru existing <br />mill tailings; holes will be grouted shut or the u eng o the hole as the drill string acs out o the <br />hole; samples of the augeFed material will be sent eff site for laboratory testing; balanGe of material <br />will be buried on site in the tailings sands. Some smoothing of tailings sands may be necessary for <br />drill truck access. Site access is directly from CR-2. No new roads will be constructed. <br />12. Proposed Disturbance (approximate) Describe the proposed drilling to be conducted, including anticipated number of holes, <br />diameter, depth, location, etc... Submit additional pages if necessary: <br />A. Drill Pads: Quantity Average Width <br />B. Drill Holes: Quantity 10.00 Depth 60.00 <br />(ft) Average Length (ft) <br />(ft) Diameter 6.00 (in) <br />C. Mud Pits: Quantity Average Width (ft) Average Length (ft) <br />Average Depth (ft) <br />Described proposed underground work, including reopening of old workings, advancement of adits or shafts, <br />trenches, pits, cuts, rock dumps, or other types of disturbance, describe type, quantity and general dimensions: <br />None <br />F. Other Disturbances (please describe): <br />None <br />G. Indicate Chemicals and Fuels used or stored on site. List type, quantity and method to store. <br />Diesel fuel, portland cement and bentonite. Quantities to be determined by the drill <br />contractor but are anticipated to be not greater than 50 gal diesel fuel in a pick up truck <br />mounted fuel cell, and 500 lb or less of portland cement and approximately 500 lb orless <br />of bentenite. <br />F. New Road(s): Length (ft) Width (ft) <br />Significantly Upgraded Road(s) Length (ft) Width <br />(ft) <br />Are culverts or other crossings proposed? If so, please describe: <br />No new road constructon.