My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-06-02_APPLICATION CORRESPONDENCE - C2010089 (10)
DRMS
>
Day Forward
>
Application Correspondence
>
Coal
>
C2010089
>
2011-06-02_APPLICATION CORRESPONDENCE - C2010089 (10)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:34:06 PM
Creation date
6/3/2011 8:50:28 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C2010089
IBM Index Class Name
APPLICATION CORRESPONDENCE
Doc Date
6/2/2011
Doc Name
Response to Preliminary Adequacy Review
From
Western Fuels Association
To
DRMS
Email Name
MLT
SB1
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
63
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Colorado Department of Public Health and Environment <br />Air Pollution Control Division Page 4 of 7 <br />- MINING OPERATIONS - <br />? Enclosures Type: (Complete or Partial) <br />? Revegetation Revegetation Must Occur Within One Year Of Soil Disturbance <br />® Other (specify) Water as needed <br />1. PROCESSING <br />Will processing (i.e., crushing, screening, etc) occur on site? No <br />NOTE: ALL PROCESS EQUIPMENT REQUIRES A SEPARATE PERMIT APPLICATION AND <br />ADEN. <br />PRIMARY CRUSHING <br />Maximum tons crushed per year: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />? Moist Material <br />? Water Spray <br />? Enclosure Type: <br />? Other (specify) <br />SECONDARY CRUSHING <br />Maximum tons crushed per year: <br />Maximum tons crushed per hour: <br />Hours of crushing per day: <br />Proposed Controls: <br />? Moist Material <br />? Water Spray <br />? Enclosure Type: <br />? Other (specify) <br />J, CONVEYORSITRANSFER POINTS <br />Tons Of Material Conveyed Per Year <br />Tons Of Material Conveyed Per Day <br />Proposed Controls <br />? Enclosure Type: _ <br />? Other (specify) <br />Number Of Transfer Points : <br />Proposed Controls <br />? Enclosure Type: <br />? Water Spray <br />? Chemical Stabilizer <br />? Other (specify) <br />(Indicate On A Separate Diagram How Conveyor System Is Set Up) <br />Tons <br />Tons <br />SCREENING/CLASSIFYING <br />Maximum tons screened per year: Tons <br />Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />? Moist Material <br />? Water Spray <br />? Enclosure Type: <br />? Other (specify) <br />RESCREENING/CL ASSIF Y ING <br />Tons Maximum tons screened per year: Tons <br />Tons Maximum tons screened per hour: Tons <br />Hours of screening per day: <br />Proposed Controls: <br />? Moist Material <br />? Water Spray <br />? Enclosure Type: <br />? Other (specify) <br />N/A Tons. <br />Tons. <br />(Complete or Partial) <br />(Complete or Partial) <br />Revised September 2004 hn:///%nviv ededphe state co us/ap/stationarv.html
The URL can be used to link to this page
Your browser does not support the video tag.