Laserfiche WebLink
tributaries of Coal Canyon, namely Glasier Draw and Meehan Draw, and the tributary of <br />Tuttle Draw, namely Nygren Draw, which pass through the permit area and which appear on <br />Map 2.04.7-1 and Map 2.05.3(3)-1. In order to avoid any confusion, please explain early on <br />in the text descriptions that Glasier Draw and Meehan Draw are tributaries of Coal Canyon <br />and that Nygren Draw is a tributary of Tuttle Draw. <br />Response - Text revised as suggested. <br />2. On page 13 of Section 2.04.7, Tuttle Draw and Coal Canyon are described as being <br />perennial streams. Please describe the stream classifications for Glasier Draw, Meehan Draw <br />and Nygren Draw. <br />Response - Text revised as suggested <br />3. In the Surface Water Monitoring section on page 15 of Section 2.04.7, it is stated that there <br />are 10 surface water monitoring stations, numbered SW-N200 through SW-N209. These 10 <br />sites also appear in Table 2.04.7-5 on page 17 of Section 2.04.7 as well. However, on Map <br />2.04.7-1, "Hydrologic Water Monitoring Locations", site SW-N210 also appears. Please <br />explain. <br />Response - The inconsistencies have been corrected. The number of surface water <br />monitoring stations now stands at 15 (SW-N200 to SW-N214). <br />4. In the two sentences before the last sentence in the Surface Water Monitoring section on <br />page 15 of Section 2.04.7, a discussion involving SW-7, SW-6 and GW-7 is presented. <br />However, these three sites do not appear on Map 2.04.7-1 and GW-7 would be a ground <br />water monitoring site. Please explain and modify the text discussion if appropriate. <br />Response - Text corrected and revised. <br />5. In the last paragraph on permit application page 15 of Section 2.04.7, it is stated that surface <br />flow at NHN is totally dependent on the irrigation water from the 2nd Park Lateral ditch <br />system. However, Meehan Draw, Glasier Draw and Nygren Draw are located within the <br />permit area and have recorded flows. Please explain and modify the text if necessary. <br />Response - Text modified to explain the relationship between Second Park Lateral and <br />Meehan, Glasier, and Nygren Draws. <br />6. Under Rule 2.04.7(2) and referring to Map 2.04.7-1 and Table 2.04.7-5 on page 17 of <br />Section 2.04.7, please explain why Nygren Draw does not have any operational surface <br />water monitoring sites, since it passes through the permit area. <br />Response - Nygren Draw was historically monitored and reported in New Horizon I <br />Permit, (see Comment S, Ground Water Information. Monitoring of Nygren Draw will <br />resume prior to disturbance. Additional sampling sites have been established at these <br />locations as of 21I11II.See Map 2.04.7-1. <br />7. In Table 2.04.7-5 on page 17 of Section 2.04.7, surface water monitoring stations SW-N201 <br />and SW-N208 are listed for the 2°d Park sub lateral. However, this sub lateral does not <br />appear on Map 2.04.7-1. Please explain. In addition, are all of the irrigation ditches and their <br />branches shown on the map? Sub Lateral ditches added to map. <br />Response to First Adequacy Review Page 20