Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # OlA Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />Altitude: <br />Material Weight: <br />Blade type: <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />0.800 (FND-RF) <br />1.225 (CAT HB) <br />0.930 (CAT HB) <br />0.868 (CAT HB) <br />1.000 (PAT) <br />Net correction`. 0.5909 <br />Adjusted unit production: <br />Adjusted fleet production: <br />524.60 LCY/hr <br />524.6 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.305/LCY <br />Total job time: 7.82 Hours <br />Total job cost: $1,252.44 <br />CIRCES Cost Estimating Software <br />