Laserfiche WebLink
BULLDOZER RIPPING WORK <br />Task description: Rip 5 acres of compacted area <br />Permit Action: SI-01 Permit/Job#: M1980203 <br />Currier Gravel Pit <br />Site: <br />PROJECT IDENTIFICATION <br />Task #: 03A State: Colorado <br />Date: 5/26/2011 County: Mesa <br />User: THM <br />Seismic: <br />Area: <br />Agency or organization name: DRMS <br />HOURLY EQUIPMENT COST <br />Basic Machine: Cat D7R DS Series II - 7SU <br />Ripper Attachment: 3-Shank Ripper <br />Abbreviation: None <br />Filename: M203-03a <br />Horsepower: 240 <br />Shift Basis: 1 per day <br />Data Source: (CRG) <br />Cost Breakdown: Utilization <br />% <br />Ownership Cost/Hour: $48.37 NA <br />Operating Cost/Hour: $68.72 100 <br />Ripper Operating Cost/Hour: $4.68 - 100 <br />Operator Cost/Hour: $38.49 NA <br />Total Unit Cost/Hour: $160.25 <br />Total Fleet Cost/Hour: $160.25 <br />MATERIAL QUANTITIES Selected estim ating method: Area <br />Alternate Methods: <br />NA Bank Volume: NA <br />Rip Depth (ft): 1.00 BCY <br />Volume: 8,067 <br />5 acres <br />Source of estimated quantity: Staff Estimate <br />HOURLY PRODUCTION <br />Seismic: NA <br />Seismic Velocity: <br />Area: <br />Average Ripping Depth: <br />Average Ripping Width: <br />Average Ripping Length: <br />Average Dozer Speed: <br />Average Maneuver Time: <br />Production per unit area: <br />Job Condition Correction Factors <br />Unadjusted Hourly Unit Production: <br />Site Altitude: <br />Altitude Adj: <br />Job Efficiency: <br />Net Correction: <br />Adjusted Hourly Unit Production: <br />Adjusted Hourly Fleet Production: <br />JOB TIME AND COST <br />Fleet size: 1 Grader(s) <br />Unit cost: $302.145 Per acre <br />2.45 <br />6.50 <br />150.00 <br />88.00 <br />0.25 <br />0.687 <br />0.687 <br />7,600 <br />0.93 <br />0.83 <br />0.77 <br />0.53 <br />0.53 <br />Total job time: <br />feet/second <br />mph <br />degrees <br />feet <br />feet <br />feet <br />acres/hour <br />Acres/hr <br />_ feet <br />_ (CAT HB) <br />(1 shift/day) <br />multiplier <br />Acres/hr <br />Acres/hr <br />NA <br />BCY or CCY <br />9.43 Hours <br />Total job cost: $1,511.00 <br />CIRCES Cost Estimating Software