Laserfiche WebLink
COST SUMMARY WORK <br />Task description: Final Reclamation Cost Update <br />Site: Berry Pit Permit Action: SI-05 <br />PROJECT IDENTIFICATION <br />Task #: 000 State: Colorado <br />Date: 5/26/2011 County: Rio Blanco <br />User: THM <br />Agency or organization name: DRMS <br />TASK LIST (DIRECT COSTS) <br />Pennit/Job#: M1977132 <br />Abbreviation: None <br />Filename: M132-000 <br />Task <br />Description Form <br />Used Fleet <br />Size Task <br />Hours <br />Cost <br />O 1 a Regrade two new lease area strips to final grade DOZER 1 61.75 $9,798.64 <br />02a Replace overburden over 4.1 acres at F depth SCRAPERI 1 5.97 $6,702.54 <br />03a Replace topsoil from stockpile C on regraded strip SCRAPERI 1 9.31 $11,991.06 <br />04a Regrade old lease area DOZER 1 24.66 $4,240.68 <br />05a Regrade sediment and DOZER 1 15.07 $2,591.48 <br />06a Re grade protection berm topsoil DOZER 1 27.12 $4,663.32 <br />07a Revegetation REVEGE 1 40.00 $66,310.72 <br />08a Mobilization MOBILIZE 1 10.24 $15,521.98 <br />SUBTOTALS: 194.12 $ $121,820.42 <br />INDIRECT COSTS <br />OVERHEAD AND PROFIT: <br />Liability insurance: 2.02 <br />Performance bond: 1.05 <br />Job superintendent: 97.06 <br />Profit: 10.00 <br />Total = <br />Total = <br />Total = <br />Total = <br />TOTAL O&P= <br />CONTRACT AMOUNT (direct + O & P) = <br />LEGAL - ENGINEERING - PROJECT MANAGEMENT: <br />Financial warranty processing (legal/related costs): 500.00 <br />Engineering work and/or contract/bid preparation: 0.00 <br />Reclamation management and/or administration: 5.00 $7,171.31 <br />CONTINGENCY: 0.00 Total = $0.00 <br />TOTAL INDIRECT COST = $29,277.06 <br />TOTAL BOND AMOUNT (direct + indirect) = $151,097.48 <br />$2,460.77 <br />$1,279.11 <br />$5,683.83 <br />$12,182.04 <br />$21,605.75 <br />$143,426.17 <br />Total = 500.00 <br />Total = $0.00