Laserfiche WebLink
Bulldozer Worksheet Cont'd Task # 05A Page 2 of 2 <br />Visibility: <br />Job efficiency: <br />Spoil pile: <br />Push gradient: <br />. Altitude: <br />Material Weight: <br />Blade type:. <br />1.000 (AVG.) <br />0.830 (1 SHIFT/DAY) <br />0.700 (FND-MF) <br />0.903 (CAT HB) <br />1.000 (CAT HB) <br />0.958 (CAT HB) <br />1.000 (PAT) <br />Net correction: 0.3393 <br />Adjusted unit production: <br />Adjusted fleet production: <br />289.29 LCY/hr <br />289.29 LCY/hr <br />JOB TIME AND COST <br />Fleet size: 1 Dozer(s) <br />Unit cost: $0.594/LCY <br />Total job time: 15.07 Hours <br />Total job cost: $2,591.48 <br />CIRCES Cost Estimating Software <br />