My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-26_INSPECTION - M1977132
DRMS
>
Day Forward
>
Inspection
>
Minerals
>
M1977132
>
2011-05-26_INSPECTION - M1977132
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:50 PM
Creation date
6/1/2011 9:15:32 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
M1977132
IBM Index Class Name
INSPECTION
Doc Date
5/26/2011
Doc Name
Inspection report
From
DRSM
To
Oldcastle SW Group, Inc.
Inspection Date
5/19/2011
Email Name
THM
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
22
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Scraper Worksheet Cont'd Task # 02A Page 2 of 2 <br />Cycle Time: <br />Scraper Loading Time: <br />Maneuver and Spread Time: <br />Job Condition Correction: <br />:1.00 Minutes <br />0.60 Minutes <br />Site Altitude: 6350 feet <br /> Scraper Push Dozer Source <br />Altitude Ad': 1.000 1.000 (CAT HB) <br />Job Efficient : 0.830 0.830 (CAT HB <br />Net Correction: 0.830 0.830 <br />Travel Time: <br />Road Condition: Firm smooth rolling dirt/It surfaced watered, maintained 3.0 <br />Seg # Haul Distance (Ft) Grade Roll. Res Total Res Velocity (fpm) Travel Time <br />(min) <br />1 500.00 1.50 3.00 4.50 2394 0.49 <br />Haul Time: 0.49 minutes <br />Seg # Haul Distance (Ft) Grade Roll. Res <br />°/u Total Res <br />(% Velocity (fpm) Travel Time <br />(min) <br />1 500.00 -1.50 3.00 1.50 2960 0.30 <br />Return Time: 0.30 minutes <br />Total Scraper team cycle time: 2.39 minutes <br />Adjusted for job conditions: 1,208.54 LCY/Hour <br />Selected Number of Scrapers: 2 Scraper(s) <br />Adjusted single scraper team (unit) hourly production: 1,208.54 LCY/Hour <br />Adjusted multiple scraper team (fleet) hourly production: 1,208.54 LCY/Hour <br /> <br />Unadjusted unit production/hour: 1,456.07 LCY/Hour <br />Optimal Number of Scrapers per push dozer: <br />JOB TIME AND COST <br />Fleet size: 1 <br />Unit cost: $0.93a <br />Team(s) Total job time: 5.97 Hours <br />/LCY Total job cost: $6,702.54 <br />CIRCES Cost Estimating Software
The URL can be used to link to this page
Your browser does not support the video tag.