My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-27_PERMIT FILE - P2011008
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011008
>
2011-05-27_PERMIT FILE - P2011008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:53 PM
Creation date
6/1/2011 8:45:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011008
IBM Index Class Name
PERMIT FILE
Doc Date
5/27/2011
Doc Name
NOI approved & reclamation cost estimate letter
From
DRMS
To
Belleview Land & Mineral Co., LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimating Software <br />WHEEL LOADER - LOAD AND CARRY WORK <br />PROJECT IDENTIFICATION <br />Task #: 004 <br />Date : 0512712011 <br />User : RCO <br />Agency or organization name : DRMS <br />State : Colorado <br />County:Saguache <br />Site : Klondike Prospect <br />Permit/job #: P-2011-008 <br />Abbreviation :none <br />Filename : P008-004 <br />Permit or other job action :New N01 <br />Task description : Place imported topsoil on trenches <br />HOURLY EQUIPMENT COST Basic machine : CAT 914G <br />Attachment no. 1 : ROPS Cab <br />Horsepower: 90 <br />Shift basis : 1 per day <br />Data source : (CRG) <br />Utilization % <br />Cost Breakdown : Ownership cost/hour : $12.76 NA <br />Operatingcost/hour: $17.25 100 <br />Operator cost/hour : $38.54 NA <br />Total unit cost/hour : $68.54 Total fleet cost/hour : $68.54 <br />MATERIAL QUANTITIES <br />Initial Swell Final <br />volume : 100 LCY factor : NA volume : 100 LCY <br />Source of quantity take-off : 900x3 ft, assume purchase 50% of needed 4-inch depth <br />Source of estimated swell factor : NA <br />HOURLY PRODUCTION (cat Ha) <br />Loader Cycle Time Unadjusted basic cycle time (load, dump, maneuver) : 0.475 minutes <br />Cycle Time Factors Factor (min.) Source <br />Material : Material 314" to 6" diameter 0.000 (Cat HB) <br />Stockpile : No adjustment - factor not applicable 0.000 (Cat HB) <br />Truck ownership : No adjustment - factor not applicable 0.000 (Cat HB) <br />Operation : No adjustment - factor not applicable 0.000 (Cat HB) <br />Dump target : No adjustment - factor not applicable 0.000 (Cat HB) <br />Net cycle time adjustment : 0.000 minutes <br />Adjusted basic cycle time : 0.475 minutes <br />Rolling Resistance - Road Conditions <br />Haul : Soft, rutted dirt, no maintenance or water, 4" tire penetration <br />Return : Soft, rutted dirt, no maintenance or water, 4" fire penetration <br />Haul and Return Time Length <br />(feet) Grade res. <br />(%) Rolling res. <br />(%) Total res. <br />(%) Travel time <br />(minutes) Data <br />Source <br />Haul route : 500 0.00 8.00 8.00 0.4755 (Cat HB) <br />Return route : 500 0.00 8.00 8.00 0.4755 (Cat HB) <br /> Total travel time : 0.9510 minutes <br />Loader Bucket Capacity Total cycle time : 1.426 minutes <br />Rated capacity : 1.70 LCY (heaped) (Cat HB) <br />Bucket fill factor : 1.100 Other- rock/dirt mixtures (100-120%) <br />Adjusted capacity : 1.87 LCY <br /> Source <br />Job Condition Correction Factors Altitude adjustment factor : 0.91 (Cat HB) <br />Site altitude : 9,350 feet Job efficiency factor : 0.83 (1 shift/day) <br /> Net correction : 0.76 multiplier <br />Unadjusted hourly unit production : 78.68 LCY/Hr <br />Adjusted hourly unit production : 59.43 LCY/Hr (Cat HB) <br />Adjusted hourly fleet production : 59.43 LCY/Hr <br />JOB TIME AND COST <br />Fleet size : 1 Loader(s) Total job time : 1.68 Hours <br />Unit cost : $1.153 <br />i /LCY Total job cost : <br />_ $115
The URL can be used to link to this page
Your browser does not support the video tag.