My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-27_PERMIT FILE - P2011008
DRMS
>
Day Forward
>
Permit File
>
Prospect
>
P2011008
>
2011-05-27_PERMIT FILE - P2011008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:53 PM
Creation date
6/1/2011 8:45:36 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
P2011008
IBM Index Class Name
PERMIT FILE
Doc Date
5/27/2011
Doc Name
NOI approved & reclamation cost estimate letter
From
DRMS
To
Belleview Land & Mineral Co., LLC
Email Name
RCO
Media Type
D
Archive
No
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CIRCES Cost Estimatina Software <br />EQUIPMENT MOBILIZATION / DEMOBILIZATION <br />PROJECT IDENTIFICATION <br />Agency or organization name: DRMS <br />Task #: 006 State : Colorado Permit/job # : P-2011-008 <br />Date : 0512712011 County :Saguache Abbreviation :none <br />User : RCO Site :Klondike Prospect Filename :P008-006 <br />Permit or other job action : New Noi <br />Task description :Haul reclamation equipment to and from site <br />EQUIPMENT TRANSPORT RIG COST Shift basis : 1 per day <br /> Cost data source : CRG Data <br />Truck tractor description : Generic on-highway truck tractor, 6x4, diesel powered, 400 HP (2nd half, 2006) <br />Truck trailer description :Generic folding gooseneck, drop deck equipment trailer (25T, 50T, and 1007) <br />Available rig capacities : 0-25 Tons 26-50 Tons 51+ Tons <br />Cost Breakdown : Ownership cost/hour : $16.63 $18.37 $22.33 <br />Operating cost/hour : $44.38 $46.13 $50.07 <br />Operator cost/hour : $27.66 $27.66 $27.66 <br />Helper cost/hour:, $0.00 $25.39 $25.39 <br />Total Unit Cost/hour : $88.67 $117.55 $125.45 <br />NON-ROADABLE EQUIPMENT <br />Machine <br />Description Weight/unit <br />(Tons) Ownership <br />Cost/hr/unit Haul Rig <br />Cost/hr/unit Fleet Size <br />(No. units) Haul Trip <br />Cost/hr/fleet Return Trip <br />Cost/hr/fleet DOT permit <br />Cost/fleet <br />-Cat 315C L 18.63 $19.86 $88.67 1 $108.53 $88.67 $0.00 <br />-CAT 914G 8.10 $11.24 $88.67 1 $99.91 $88.67 $0.00 <br />-Weed spray equipmt 4.00 $10.00 $88.67 1 $98.67 $88.67 $0.00 <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br /> <br />Subtotals : $307.11 $266.01 $0.00 <br />sheet 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.