Laserfiche WebLink
May 11, 2011 Page iii <br />Page <br />4.13.1 Timber Frame Building Subsidence Control Plan ...... .............................16 <br />4.13.2 Timber Frame Building Monitoring Plan ................... .............................17 <br />4.13.3 Worst Possible Consequences of Damage to Timber Frame Building .....17 <br />4.13.4 Timber Frame Building Damage Mitigation Plan ....... .............................17 <br />4.14 Purgatoire River Alluvial Valley Floor .................................. .............................18 <br />4.14.1 Alluvial Valley Floor Subsidence Control Plan .......... .............................18 <br />4.14.2 Alluvial Valley Floor Monitoring Plan ...................... .............................18 <br />4.14.3 Worst Possible Consequences of Damage to Alluvial Valley Floor ........19 <br />4.14.4 Alluvial Valley Floor Damage Mitigation Plan .......... .............................19 <br />LIST OF TABLES <br />Table 1. Depth to Allen Seam from Surface Structures ............. <br />Table 2. Classification Summary of Surface Structures ............. <br />..............2 <br />... ..............................4 <br />Agapito Associates, Inc. <br />