My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-18_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-05-18_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:38 PM
Creation date
5/31/2011 8:33:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/18/2011
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
• <br />Rock Bin <br />The rock bin is located on the east side of the breaker building Map 11, Sheet 3 —East Portal Facilities. <br />The bin has a concrete floor, steel and wood frames 2 sides. <br />Site Plan Area: Rock Box at Breaker <br />Item Concrete Steel and Wood <br />Length (ft) <br />80 <br />Width (ft) <br />Width (ft) <br />Depth/height (ft) <br />Deptb/height (ft) <br />10 <br />Units <br />Quantity <br />20 <br />3,000 <br />Units <br />CY <br />LBS <br />Unit cost <br />$74 <br />$0.13 <br />Total direct cost <br />$1,480 <br />$399 <br />Job supervision hours <br />8 <br />8 <br />Job supervision cost <br />$333 <br />$333 <br />Profit, insurance, and bond <br />$193 <br />$52 <br />Contract <br />$2,007 <br />$785 <br />Engineering <br />$85 <br />$33 <br />Reclamation management <br />$100 <br />$39 <br />Estimated bond <br />$2,193 <br />$857 <br />:7 <br />Rope Slope Portal Drain <br />The rope slope invert requires a drain to minimize the surface runoff of water into the slopes. <br />Site Plan Area: Rope Slope Portal <br />Retaining Wall <br />and Trench <br />Item Drain <br />Length (ft) <br />80 <br />Width (ft) <br />12 inch <br />Depth/height (ft) <br />Quantity <br />10 <br />Units <br />CY <br />Unit cost <br />$74 <br />Total direct cost <br />$740 <br />Job supervision hours <br />8 <br />Job supervision cost <br />$333 <br />Profit, insurance, and bond <br />$97 <br />Contract <br />$1,170 <br />Engineering <br />$50 <br />Reclamation management <br />$59 <br />Estimated bond <br />$1,278 <br />TR 54 Exhibit 28 —Page 149 Revised 11 -03 -2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.