My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2011-05-18_PERMIT FILE - C1981012A
DRMS
>
Day Forward
>
Permit File
>
Coal
>
C1981012
>
2011-05-18_PERMIT FILE - C1981012A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
8/24/2016 4:33:38 PM
Creation date
5/31/2011 8:33:40 AM
Metadata
Fields
Template:
DRMS Permit Index
Permit No
C1981012A
IBM Index Class Name
Permit File
Doc Date
5/18/2011
Doc Name
Bond Calculations (TR54, TR53, PR3, TR55, TR56)
Section_Exhibit Name
Exhibit 28 Appendix B Part 2
Media Type
D
Archive
Yes
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
48
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
. Slope Track System <br />The slope track and turnout is shown on Map 11, Sheet 1 —East Portal Roads, Slope Tracks and <br />Cut Areas. The track is 85# ASCE rail mounted on steel ties that are bedded in ballast. <br />Refer to Figure 13 for a typical slope track section. <br />Site Plan Area: <br />Slope Track System <br />Item <br />Track <br />Slope <br />Length (ft) <br />Width (ft) <br />Depth/height (ft) <br />3,000 <br />2,400 <br />Quantity <br />85,000 <br />68,000 <br />Units <br />LBS <br />LBS <br />Unit cost <br />$0.13 <br />$0.13 <br />Total direct cost <br />$11,305.00 <br />$9,044.00 <br />Job supervision hours <br />32 <br />8 <br />Job supervision cost <br />$1,334 <br />$333 <br />Profit, insurance, and bond <br />$1,478 <br />$1,182 <br />Contract <br />$14,116 <br />$10,559 <br />Engineering <br />• <br />$600 <br />$449 <br />Reclamation management <br />$706 <br />$528 <br />Estimated bond <br />$15,422 <br />$11,536 <br />• <br />TR 54 Exhibit 28 —Page 147 Revised 12 -13 -2010 <br />
The URL can be used to link to this page
Your browser does not support the video tag.