Laserfiche WebLink
• <br />New Elk Coal Company <br />Permit C- 1981 -012 <br />TR 54 Site Facilities <br />This technical revision schedule estimates the bonding required to reclaim the following <br />facilities s lope conveyor driv hoist house, hoist sheave, rock box addition to the breaker <br />building, c entra m' station bui mg, ewa e plant buildin ate�tiine vaults 1 -4� 00,000 <br />gallon water tank, 1- 25,000 gallon potable water tan s ope rail turnou rock dust b in, r cQ k du <br />compresso rock dust pressure vesse water distribution pipeline, emergency escape ho ist and <br />e lectrical power distribution upgr ade. The locations of the proposed facilities are noted on Map <br />12 Sheet 1 East Portal Roads, Slope Track and Cut Areas, Sheet 2 East Portal Utilities and <br />Roads, and Sheet 3 East Portal Facilities. <br />A small cut is required for safe placement of the rock dust bin and supporting equipment. <br />A small ditch will route the storm water around the cut to insure integrity of the cut slope. The <br />cut material will be placed to bring the hoisting and conveyor drive areas to grade. Topsoil will <br />be removed and stored in the topsoil storage pile located near the mine entrance. <br />All areas involved with the exception of the small cut have already been disturbed and <br />have been bonded for rough and fina grading, seeding and mulching„ This bonding covers the <br />ae o tion of foundations, removal of tences removal to scrap o sa lvage of the equipment. <br />• <br />The following pages detail the cost estimate. In summary, the estimate is: <br />Total direct cost <br />$ <br />282,668 <br />Job supervision hours <br />426 <br />Job supervision cost <br />$ <br />16,755 <br />Profit, insurance, bond <br />$ <br />36,945 <br />Contract <br />$ <br />336,368 <br />Engineering <br />$ <br />14,296 <br />Reclamation management <br />$ <br />16,818 <br />Estimated bond <br />$ <br />367,482 <br />• <br />TR 54 Exhibit 28 —Page 129 Revised 11 -03 -2010 <br />