Laserfiche WebLink
DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall Report No. 6 <br />Location Larimer County, Colorado Date 31 Dec 2007 <br />Client Compass Environmental, Inc. Page 1 of 1 <br />Contractor Compass Environmental, Inc. File No. 107021-001 <br />Weather Clear Temperature 30's F <br />I. CONTRACTOR'S ACTIVITIES: <br />Contractor Start Work <br />Contractor Stop Work 0700 hrs <br />1230 Hrs <br />Top of Backfill Slope at Start NA _ _- <br />To of Backfill. Slope at Stop NA <br />Toe of Backfill Slope at Start <br /> <br />- <br />--............. __...__._...._ ---------- __..._ ...................... _. _............. ...... __................... __.... <br />Toe of Backfill Slope at Stop 31+80 <br /> <br /> <br />31+80 <br /> <br />Set at Start <br />............................................ -- ....... _............................. _.................. -- ............... ............. ._......_.._......... <br />Last - - - - - Comp..........._.._.. leted _ _. -.._. <br />Last Completed Set at Stop <br />32+30 <br />---- - -- - --- - --- <br />32+30 <br />Verified Area of Excavated Alluvium above Bedrock Cumulative 5045 Sq.. Ft_ <br />Verified Area of Excavated Bedrock. (Cumulative) 3865 S q. Ft. <br />Total Area Excavated To Date 8910 S q. Ft. <br />Excavator Type Komatsu PC800 <br />Fresh Slurry Made No <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed -- -- Just enough to to off trench <br />Bentonite Slurry - In Trench -- -- No excavation <br />Backfill (Slump, Density) -- -- No backfill mixed <br />Backfill Gradation -- -- No backfill mixed <br />Backfill (Permeability) -- -- -- <br />Verified Clean AM Backfill <br />Slope and Bottom of Key No NA <br />Verified Depth To Bedrock <br />and Key No NA <br />1. Attempted to observe slurry trenching activities but due to the frozen ground, no backfill could be made <br />2. Prepared Daily Field Report. <br />ATTACHMENTS: None <br />Field Representative(s) Time on site Total <br />Benny Siljenberg 0700 7 <br />Distribution: Jeff Sallas; file <br />G:\PROJECTS\ 10702 1 -000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Constniction\C.4 Field Reports\Daily Reports\DFR 071231.doc