Laserfiche WebLink
DAILY FIELD REPORT <br />Project Loveland Ready Mix Slurry Wall Report No. 40 <br />Location Larimer County, Colorado Date 28 April 2008 <br />Client Compass Environmental, Inc. Page 1 of 1 <br />Contractor Compass Environmental, Inc. File No. 107021-001 <br />Weather Partly Cloudy Temperature 40's - 60's F <br />L CONTRACTOR'S ACTTVTTTF.S! <br />Contractor Start Work 0700 hrs <br />Contractor Stop Work 1200 hrs <br />Top of Backfill Slope at Start 54+80 <br />To of Backfill Sloe at Stop 54+80 <br />Toe of Backfill Slope at Start 56+80 <br />Toe of Backfill Sloe at Stop 56+80 <br />Last Completed Set at Start 57+20 <br />Last Completed Set at Stop 57+20 <br />Verified Area of Excavated Alluvium and Bedrock (Dail) 0 S q. Ft. <br />Total Area Excavated To Date 89,280 S q. <br />Ft. <br />Excavator Type Komatsu PC800 <br />Fresh Slurry Made No <br />FIELD REPRESENTATIVE'S ACTIVITIES: <br />Quality Control Number of <br />Samples Location or Batch # Comments <br />Bentonite Slurry - As-Mixed -- -- No slurry mixed on this day <br />Bentonite Slurry - In Trench -- -- No trench excavation on this day <br />Backfill (Slump, Density) -- -- No backfill mixed on this day <br />Backfill (Gradation) -- -- No backfill mixed on this day <br />Backfill (Permeability) -- -- Next permeability sample to be taken around <br />STA 60+00. <br />Verified Clean AM Backfill <br />Slope and Bottom of Key Yes 54+80 through 57+20 Trench cleaned to bottom of key prior to next <br />excavation set. <br />Verified Depth To Bedrock <br />and Key No No excavation on this <br />day -- <br />1. The crew worked on various tasks around the job site while waiting on a bentonite delievery. As of noon, the delivery <br />did not happen and the crew was dismissed from the job site. <br />ATTACHMENTS: None <br />Field Representative(s) Time on/off site Total <br />Benny Siljenberg 0700/1200 7 <br />Distribution: Jeff Sallas; file <br />C:\107021-001 Ready Mix\107021-000 Loveland Ready Mix Slurry Wall\C. Lyman Henn Inc. <br />Construction\C.4 Field Reports\Daily Reports\DFR's\DFR 080428.doc