Laserfiche WebLink
Page 4of4 <br />TABLE V <br />SOIL-BACKFILL FIELD TEST RESULTS <br />LOVELAND READY MIX SLURRY WALL <br />LARIMER COUNTY, COLORADO <br /> <br /> <br />Date Sampled <br /> <br />Sample number Top of <br />Backfill Slope <br />Location <br /> <br />Slump (inches) <br /> <br />Unit Weight (pcf) <br />132 24-Jun-08 SB-132 26+30 4.00 112.0 <br />133 24-Jun-08 SB-133 26+70 4.50 108.8 <br />134 25-Jun-08 SB-134 27+10 4.50 112.0 <br />135 25-Jun-08 SB-135 27+50 4.00 113.2 <br />136 26-Jun-08 SB-136 27+70 4.50 116.0 <br />137 26-Jun-08 SB-137 28+40 4.00 115.2 <br />138 27-Jun-08 SB-138 29+00 4.00 113.6 <br />LYMAN HENN INC. <br />GAPR0JECTS\107021-000 Loveland Ready Mix Slurry Wall\C. Construction\C.4 Field Reports\[quality control worksheets <br />to match compass.xls] Report Table-SB properties