Laserfiche WebLink
TABLE OF CONTENTS <br />Page <br />LIST OF TABLES iii <br />LIST OF FIGURES iii <br />1. PROJECT OVERVIEW 1 <br />2. WORKING PLATFORM CONSTRUCTION 2 <br />2.1 Slurry Wall Alignment Survey 2 <br />2.2 Deviations from the Plans and Specifications 2 <br />3. SOIL-BENTONITE BACKFILLED SLURRY WALL CONSTRUCTION 3 <br />3.1 Bentonite Slurry Mixing and Delivering 3 <br />3.2 Bentonite Slurry Quality Control Results 3 <br /> 3.2.1 As-Mixed Slurry 3 <br /> 3.2.2 In-Trench Slurry 3 <br />3.3 Slurry Trench Excavation 3 <br />3.4 Soil-Bentonite Mixing and Placement 4 <br /> 3.4.1 Backfill Components 4 <br /> 3.4.2 Backfill Mixing and Placement Procedures 4 <br /> 3.4.3 Soil-Bentonite Backfill Sampling Procedure 5 <br />3.5 Deviations from the Plans and Specifications 5 <br />4. LIMITATIONS 7 <br />TABLES <br />FIGURES <br />APPENDIX A - Lyman Henn Inc. & WRS Compass Daily Field Reports <br />APPENDIX B - Knight Piesold Backfill Permeability Reports <br />G:\PR0JECTS\107021-000 Loveland Ready Mix Slurry Wall\R. Records and Correspondence\R.11 Reports\As-Built report stuf\As-built reportFinal.doc ii